Laserfiche WebLink
HEARINGS <br /> :00 Patricia A. Cowhig,3 Bight Circle. Proposed installation of vinyl sheet <br /> bulkhead landward of the coastal bank bordering Popponesset Creek. Continued <br /> from 9/26/13. Board requested more detailed site plan. NOI <br /> F <br /> Resource Area: _.LSCS_F, : of a Zone to Coastal 'l3a k/Salt.-M.a -s i :band Under <br /> - <br /> Material Submitted: 3 Bight Circle <br /> Hatt Creighton, BSC Croup, was present representing the Cowhigs. He stated at the <br /> previous meeting the commissioners asked that he come back with more structural design <br /> work. He met with the contractor on site and updated the plan. <br /> Matt explained the bullhead which is 120 feet long will tie into the neighbors' properties. <br /> It will o on t of the coastal bank. Everything will be done from a barge from the <br /> g p � g g <br /> waterside. The existing pier would have to be removed and then replaced when the work <br /> is done. They Will try and stabilize the bank and replant directly behind it with native <br /> vegetation. There are no major trees that will have to be cut down. They are not going to <br /> go above the FIRMA flood zone. It is more to protest.the land. The house was built in the <br /> Os but recently reconstructed. Drew suggested-supplying information that the house was <br /> constructed pre 78. He said he only saw one stake in the field. Matt said there were <br /> and explained where they were in the field. Drew asked about siltation control. Matt <br /> said the impact is mill <br />