Laserfiche WebLink
r <br /> k <br /> L <br /> Bylaw, Chapter 172 which requires wildlife habitat evaluation. The Agent said the <br /> Woods Hole Croup needs to request a waiver of this requirement. The Agent said the <br /> narrative requests maintenance m perpetuity and he didn't bink the Commissioners <br /> should grant this and suggested to add In language to the Order of Conditions; if <br /> approved, any maintenance that needs to be performed on this project requires certain <br /> number of days prior notification to the conservation department so the conservation <br /> department can review what is being maintained.and the scale of the maintenance. This <br /> would give the Commission an opportunity to comment and possibly require additional <br /> permitting. <br /> The Agent recommended a Close and Issue with the understanding regarding the <br /> maintenance in perpetuity request and noted there is a template condition that lets the <br /> pernmt holder know that the Commission does reserve the right to require additional <br /> measures (to protect the resource areas) and to amend or even revoke the permit. <br /> r <br /> No Comment from the Public <br /> Motion: Mr. Gurnee moved to Close and Issue as outlined by the Agent, Seconded <br /> by Nor. Sweet. vote -o unanimous. <br /> 6:06 Alfred S. DeFazio,204 Captain's Row. Proposed pier, ramp,float,and <br /> replacement of an existing stairway. Continued from February 27. Per Drew's <br /> instructions if new planting plan has not.been received, applicant must request <br /> continuance. N01 <br /> Resource Areas: Riverfront(Mashpee River), LSCSF, Salt Marsh, Land Under water <br /> body. <br /> Material Submitted: 204 Ca taro"s Row. Photos of site,Mitigation Planting Plan <br /> g g <br /> prepared by Gardens and Greenscape, Inc, dated 3/13/14, Proposed Pier, Ramp and Float <br /> Site Flan prepared by Cape & Island Engineering dated 12/2/13. r <br /> Matt Costa, Cape &Island n ineerm" g� was representing the applicant. Matt noted they <br /> revised the plan and provided a mitigation planting plan by a licensed contractor. The <br /> Agent reviewed that the COC for 204 Captain's Row did not pass and that he required the <br /> homeowner to present a planting plan to the Conservation Department. The condition <br /> stipulates that the mitigation plantings must be between the pool and the marsh. The <br /> Agent explained the mitigation was a direct requirement of the unauthorized construction <br /> of a pool and deck. The pool deck was retro-permitted with this mitigation regwrement <br /> and since the COC inspection did not pass, a mitigation plan was required before this <br /> hearing can go forward. The Agent suggested if the Commissioners approve thisproject, <br /> that there be an order requiring the installation of these mitigation plantings as per the <br /> plan prior to any work starting on.the dock and pier. <br /> Matt described the proposed project for the construction and maintenance of a residential <br /> pier,rarp and.float in the waters of the Mahpee River. The project site is located <br />