Laserfiche WebLink
k <br /> x <br /> Alan L. Kathryn A.Claw): SE- -249913 K i nd Way. Proposed chars <br /> removal o r r area and installation o lansca aver tYo. <br /> Resource Area: Buffer to C.B/BVW/Salt Marsh <br /> Materials Submitted: 3 Ieeland Way, Photos, Proposed Site Ilan, Conservation <br /> Commission approved plan. <br /> Alan Clapp,homeowner,, said he was proposing changes to a plan,previously approved in <br /> 2009 at 3 Keelan way. He explained the change involves removal of a turf grass area <br /> and the installation of a new landscape paver patio The proposed paver area is within the <br /> previously approved work limit. I&.Clapp explained the project using the photographs. <br /> The,Agent stated the work being proposed is essentially the removal of turf and replacing <br /> it with a patio is entirely withm the previously approved work for this plan. the Agent <br /> said as with all other administrative approvals, it is within the original scope of work, it is <br /> minor in scope and U&ing place within an area that is f00%predisturbed with existing <br /> turf surrounded by deck on one side and pea stone in the area and framed out by <br /> ornamental plantings. The Agent said what is being proposed is not going to adversely <br /> affect the stability of the bmik,the wildlife habitat of the natural vegetated buffer strip nor <br /> the water quality associated with Popponesset Bay and he recommended approval of the <br /> administrative request. <br /> No comments from the pukhoc. <br /> Motion: Mr. McKay moved to approve the administrative request,seconded by Mr. <br /> Gurnee. vote unanimous. <br /> Richard FL and Jennifer D.Man anlello: SE 43-2673/56 Kim Path,revisions; I <br /> wells and rubber linin rer <br /> e eliminated b radia lot to direct runoff stone <br /> driveway and Instalfing song tu6es. <br /> Resource Area: LSCSF, buffer zone to coastal dune <br /> Materials Submitted: .Proposed Site Flan, revise,January 1.9,2012, Cape and <br /> Islands Engineering. <br /> Ralph 1 angainello,milder, represented the applicant and said there was a change in the <br /> original plan which is to remove the drywells for roof runoff. The lot has been graded so <br /> that all runoff is directed to the stone driveway. <br /> The Agent said Conservation had a plan that didn't have the most recent changes. The <br /> original plan shored three drywells and the most recent plan did not show the drywells. <br /> The agent said he did go out to the site to see what the impact was and there's more than <br /> enough evidence on the property to show that roof runoff is not a concern because there <br /> are enough impervious surfaces that capture storm ter runoff. The most recent plans <br /> have been submitted to the Conservation Oepartment. <br />