Laserfiche WebLink
ee <br /> 4p <br /> .4own. <br /> 16 Gr6l.tNeck ad dNo7 <br /> Conservation Commission Agenda DEVISED <br /> Thursday, July 1 , 2014 <br /> I ashpee Town Hall <br /> ckway Meeting Roam MASHPEE-TOWN CLERK <br /> CALL MEETING TO ORDER: 5:55 p.m. JUL - 8 201k <br /> � <br /> RrC �E RD- <br /> PRE/POST-HEARING AGENDA: <br /> • Minutes: Approve June 12 and June 26, 2014 Minutes. - <br /> • 76 Triton Wa : Request for beach nourishment abatement SE 43-1214. <br /> • Discussion: Ion-biodegradable components (filter fabric and wire meshing) to soft solutions <br /> (South Cape Beach/New Seabury Golf course projects). <br /> • <br /> Meetinq recap: cape Cod Water Resource ource Improvement Projects. <br /> • Administrative Review: Gooseberry Island Trust. Proposed saltmarsh restoration on <br /> southeast corner of Gooseberry Island (flap 100 Parcel . - <br /> HEARINGS: <br /> 6:00 Aldo R. and Sandra Esposito, 25 Sand Dollar Lame. Proposed patio area. RDA <br /> Continued from 51812014. Homeowner requests additional continuance to allow time <br /> for new landscape arra survey proposal. <br /> 6:03 santuit Serendipity LLC, 27 santuit Lane. Proposed tree removal and tree pruning. RDA <br /> 6:06 e t it solar, LLD, 36 Savannas Path. Proposed renovation of existing structure into N 0 <br /> commercial space and construction of a warehouse along with utilities, storm-water <br /> management, driveways and parking areas. Continued from.lune 26, 2014 to allow <br /> time for field staking on the property. <br /> 6:09 Mark V. and Donnan Jean Lopez, 1Meetinghouse Road. Proposed Title 5 Septic RDA <br /> System upgrade. <br /> 6:12 Kenneth and Gloria J. Liats s, 118 shore Drive West. Proposed coastal bank NOI <br /> stabilization (soft solution) and coastal beach mitigation-replenihment. <br /> 6:16 David and Glenys Pinch in, 124 shore Drive West.. Proposed coastal bank Not <br /> stabilization (soft solution) and coastal beach mitigation replenishment. <br /> :1Michael J. and Dawn M. Southwick, 126 Shore Drive West. Proposed coastal bank Nol <br /> stabilization (softsolution) and coastal beach mitigation replenishment. <br /> 6:21 William P. Tom asin , et al, 196 Waterway. Project in substantial compliance with Coe <br /> Order of conditions 43-2741. <br /> r <br />