My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/17/2014 DESIGN REVIEW COMMITTEE Minutes
>
6/17/2014 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:05:52 PM
Creation date
11/26/2018 2:28:07 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Echo Roach <br /> For Discussion <br /> Build a 9,960 square foot building warehouse <br /> Riapresentative – Lou Seminara <br /> Arne and Lou Seminara, Dan Speakman, and Bernie Young were present. Lou Seminara said they <br /> would like to build 2 buildings in an industrial area and the buildings would be mirror images. They <br /> would be built on 2 side-by-side lots—he owns one lot noir and the other lot is under agreement. <br /> Torn Fudala suggested building the one lot now and then afterwards build the other one; otherwise i <br /> would be under Cape Cod Commission. The discussion included the following; <br /> • Jonathan Furbu h asked if they had a certified Plot Plan. response "No". <br /> • Lou.Seminara said.the lot is about 200' wide X 3 'de p. It is about one-third of the way down <br /> Echo Road. <br /> • Building would be under 10,000 square feet—a tenant is taking approximately 8,000 feet and <br /> m6l l have a loading dock. <br /> • Lou Seminara said he is'trying to get direction from this Committee so they can make right <br /> Plan. <br /> • Will put durnpster on pian--it is to be fenced in. <br /> He shed a simple concept plan and said he will keep everything plain in the front. <br /> Joel Clifford asked for a Scaled Flan to determine Fire truck turning radius. Joel explained the <br /> Fire Department needs paged access around the entire building. Joel will provide template to <br /> Mr. Seminara. Joel also explained that turning radius of the vehicle will determine hover wide <br /> the roadway should be. <br /> Torn Fudala advised that stormwater retention has to be looked at very carefully to meet <br /> regulations. <br /> Drainage has to be approved by Town. <br /> Lou-Seminara said traffic in early morning would be 8-9 contractors picking up goods, thea <br /> during the day traffic would be 2-3 contractors. <br /> Lou 'Seminara said they would probably rough-in a couple of bathrooms. Glen Harrington said <br /> Board of Health would require bathroom for each of the units. Also, over boo gallons/day flog <br /> they would have to put a denitrification system in and would have to install.reserve area. The <br /> reserve and prime to be built in at the same time. Lou-Seminara asked if okay if they want to <br /> t in denitrification system initially and then convert over later. Glen said Board of Health has <br /> no problem with phasing in. <br /> Toni Fudala said parking should be -1 2' vide X 20'. eight angle parking needs 22' to 2 '. <br /> Torn suggested to lay out perking for the most intense possible use. <br /> Torte said if roof run-off goes onto parking lot then take care of parking run-off.to bioretention <br /> area. Bernie young asked if they could bring gutters to scale area. Torn said "yes". Torg said <br /> if they want to pipe to bioretention area that would be fine. Mr. young asked if nitrogen loading <br /> calculations are done on run-off. Torn responded "no". <br /> Charlie Maintanis advised they check with the plumbing inspector re overhead garage doors. <br /> Loading dock set-back is o' to raised platform. Lou serninara said then he would put loading <br /> dock at the corner. He said front of building okay for 1-ton truck, but back for bigger tack. <br /> Glen suggested they could put pass-through where they were putting the loading dock. Glen <br /> asked if they have a use in mind for front 2,000 squame feet. Lou Seminara responded "no". <br /> Charlie Maintanis advised,fire separation aright be d erent depending on use. Lou Seminara <br /> said the building i --- <br /> to be sprinkled.. He said ,o o feet will a distribution—seed, fertilizer, <br /> equipment, mulch, lawn sprinkler parts. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.