My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/2/2014 DESIGN REVIEW COMMITTEE Minutes
>
9/2/2014 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:08:07 PM
Creation date
11/26/2018 2:29:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/02/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
68 andj 68 Echo Road <br /> d <br /> New 6uildings for industrial storage and distribution <br /> Representative— Louis serninara <br /> Mr. & Mrs. Seminara and Berrie young (engineer) were present. Mr. Seminara said 58 and 68 are <br /> abutting lots. Both lots are 200X390. <br /> Building 58 <br /> Basic warehouse for wholesale to rent. <br /> John Deere is tenant and taking over most of the building. They will do wholesale selling of <br /> landscaping items so will have seed; fertilizer; hydro-seed bulk; landscape supplies; PBC; <br /> sprinkler heads; shovels; hand tools; pest controls stored there. Mike Mendoza said Building <br /> and Fire departments will have to know quantities of fertilizers, chemicals, etc. stored. Mr. <br /> Seminara said he believes they already put this on disk. He said he also told thea they have <br /> to tell Fire Department about racks; etc. <br /> Building 25' high; and will have loading dock. <br /> Building will be sprinkled i <br /> Concrete kicker wall at bottorn. <br /> Separate 8X9 room at side for facilities room for sprinkler room, house ureter, etc. <br /> Units are to be separately metered. <br /> Two separate occupancies. Second unit to start off being vacant but will be for rent. <br /> Mike e 1lendo a said this will fall under controlled construction. Therefore architect or engineer <br /> to be involved. Mr. Seminara said he is aware of this. He said he is the general contractor on <br /> the building. <br /> Signage location to be decided and will be provided when submitting application. <br /> Fire Chief Bulb commented that Fire Department concerns have been reset. <br /> Tom Fudala said if 2 floors thea building exceeding 19,000 square feet. Mr. Seminara said he <br /> will tell there that can't be done and will only be one floor. <br /> 2 bathrooms in event in the future each bay is ever rented individually. Glen Harrington said if <br /> ever separated thea they have to be separately plumbed. <br /> No vehicles in John Deere section. <br /> Glen Harrington advised that floor drains are not allowed. Everything done on "dry basis <br /> method, Mr. Serinara said he is happy to hear that. <br /> Glen Harringtonsaid office space square footage is to be included In the septic report. Also, <br /> Glen said drainage needs sub-surface components to get rid of the grater. <br /> Each unit to have a bathroom. <br /> Ir. Young said there are 28 parking spaces.. <br /> Jonathan Furbush asked whether they would be looking for any variances. Berrie young said they <br /> are gong to ask for a waiver for curbing requirement and the thought is to install bumpers in lieu of <br /> curbing. Jonathan explained that Charlie Rowley, Town Engineer Consultant, would be involved. <br /> Jonathan explained the process in having Charlie Rowley do review and his services are charged to <br /> the applicant via bond. <br /> Glen Harrington advised that filing for septic with Board of Health can be done concurrently with filing <br /> for Permits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.