Laserfiche WebLink
i <br /> 5 <br /> : 7own of Nashpee Department oPub `works <br /> 350 J41house Road <br /> Nashyee, NA0264,9 <br /> 5o8-539-1420 <br /> Monthly deport <br /> December 2012 <br /> Activity Higbj ht <br /> • Completed 73 work requests submitted through school Dude (building maintenance <br /> req u gists) <br /> • CompI Oted faH clean-tips of.Various Torn buildings <br /> • Re-nourished South Cape Beach after coastal storm on December 26th (400 tons <br /> sand applied) <br /> • Sanded main roads the right of December 27 1h DPMI only) <br /> 0 Responded to winter storm on December /30th (DPW only; approximately B inches <br /> wet snow with freezing temperatures immediately after) <br /> • Replaced flooring in men's bathroom at senior Center by contractor) <br /> • Installed Fund dryers in student bathrooms at Quashnet school by contractor) <br /> 0 Completed cleaning and repair as necessary of gutters on ariou Town buildings . <br /> On-going Projects <br /> • Santuit Pond Dares—IFB issued for construction on December 19th; bids due on <br /> January 1 '; approval received from MA HistoricalCommission; approval received <br /> from Ma hpee Wampanoag Tribe with condition requiring onsite construction <br /> monitor; Army Corps permit, IVDA office of Dana Safety permit, and VESA finding still <br /> pending. <br /> • Great Neck Road North—drainage construction completed; construction of retaining <br /> galls necessary at Various location for sidewalk begun by DPW and contractor);tree <br /> removal required for sidewalk construction begun (by DPW and contractor) <br /> Police Station--finalized plan and specifications for remaining HVAC improvements <br /> (replacement of cooling tower, air handier units,..and ductwor ;,s .ill being reviewed <br /> by Cape Lightomp-ct for possible incentives; issuance of RFB expected in February <br /> • Archives—Selectmen's subcommittee met to review <br /> opt' <br /> ions for use of the building; <br /> meeting scheduled in January after follow-up with Town Counsel <br /> Town Hall—Work for Phase II of energy management sstem underway(100%CLC <br /> funded); work includ,es control of remaining HVAC (chiller) and lights Onterior <br /> hallway and exterior parking lot) <br /> • Parking Lot Lights, Various Town Buildings—project impl mentation expected in <br /> January/February (100% CLC funded replacement of parking lot lights with LED <br /> fixtures at Town Hall,-all 3 schools, Police (rear parking), Fire#1 (rear parking), and <br /> Fire #2) <br />