Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> NOVEMBER 14,2018 <br /> 3. Floor Plans: Renovations & Additions to Goodman. Residence: 53 Godfrey <br /> Road, Mashpee, MA., Prepared by: ArchiPlicity, LLC, Jennifer Birmstiel, <br /> Construction Documents. Page 1; First Floor Plan, Page 2: Second Floor Plan, <br /> Window&Door Schedules,Page 3: Basement Floor Plan,Porch Building Section, <br /> Page 4: Elevations & Garage Hood Detail, Page 5: Elevations & Building Details, <br /> Page 6:Foundation Plan&Moment Frame Detail,Page 7: First Floor Framing Pian <br /> &Building Section,Page 8: Second Floor Framing Plan& Cupola Detail, Page 9: . <br /> Ceiling Framing Plan & Building Section, Page 10: Roof Framing Plan & False <br /> Eave Detail, Page 1.1: Building Section&Details, Page 12: Screen Porch Section, <br /> Pagel 3:Specifications. <br /> 4. Conditioned upon all Town Department comments read into the record. <br /> 5. Specific reference to the Northerly boundary of the property baring North 831201 <br /> East will be considered the side yard setback depicted as 20 ft., and 18.8 ft. and <br /> both of these dimensions will both be depicted as side yard setbacks. <br /> Mr. Gould seconded,yes,Mr. Furbush,yes,Mr.Blaisdell,yes, and Ms. Sangeleer,yes. All <br /> were in favor to grant a 19 ft. Variance from the 50 ft. buffer of the water and wetlands. <br /> 20 Evergreen Circle: Petitioner, RCA Electrical Contractors request a Special Permit <br /> under §174-25 (G) (4) and (G) (6) of the Zoning Bylaws to allow for construction of a <br /> 7,320 sq. ft. industrial building to be utilized as an electrical shop and office,.and a 2,400 <br /> sq. ft. industrial warehouse storage building on property located in an I-1 Zoning District, <br /> (Map 19,Parcel 10-2),Mashpee, MA. (Owner of Record: Evergreen Energy, LLC). <br /> Attorney David Lawler,represented the owners of RCA Electrical who were present. Also <br /> present was Dan Ojala with Down Cape Engineering. The Attorney supplied a site plan, <br /> and a purchase and sale agreement that is pending with the owner of the property. The lot <br /> is part of a subdivision, and the proposal is to build two separate industrial buildings; a <br /> main office and business building, and a smaller storage building. RCA specializes in <br /> generators and other electrical equipment. The project was approved by Plan Review, and <br /> Will be presenting to Design Review for a minor change to the signage. The business <br /> standards are met-in keeping with the bylaw, and will not be detrimental to the <br /> neighborhood for the particular use. <br /> Dan Ojala, with Down Cape Engineering explained that he met with the Design Review <br /> committee regarding the parking. He said that he is very careful with keeping the entire <br /> front yard setbacks. The site plan shows that the parking is located on the side of the <br /> building. <br /> Chairman Furbush questioned why there are two buildings on one lot. He said he spoke to <br /> the Building Commissioner, and was told it is allowed on a commercial property. He had <br /> concerns if in the future the owners decided to lease the building, what would happen to <br /> the�ti�g Simian; . <br /> 10 <br />