MASHPEE ZONING BOARD OF APPEALS
<br /> MEETING MINUTES
<br /> NOVEMBER 14,2018
<br /> Mr. Bonvie made a motion to issue RCA Electrical Contractors request a Special Permit
<br /> under §174-25 (G) (4) and (G) (6) of the Zoning Bylaws to allow for construction of a
<br /> 7,320 sq. ft. industrial building to be utilized as an electrical shop and office, and a 2,400
<br /> sq. ft, industrial warehouse storage building on property located in an I-1 Zoning District,
<br /> (Map 19, Parcel 10-2),Mashpee, MA. (Owner of Record: Evergreen Energy, LLC).
<br /> 1. The Board has determined that the applicant-meets all the,conditions of a Special
<br /> Permit under Mass General Law 40A Section 9.
<br /> 2. Site Plan — 20 Evergreen Circle, Mashpee, MA. Prepared for Capewide
<br /> Construction/RCA Generators & Electrical Contractors Inc., Date: September 12,
<br /> 2018, Revised: November 6, 2018 (Per Town Review, Lights), Scale: 1" — 20',
<br /> Signed by: Dan Ojala, Civil Engineer,No. 46502, Sheet 1 of 2, Detail Sheet 2 of 2.
<br /> Owner of record: Evergreen Energy, LLC.
<br /> 3. Building Plan — Morton Buildings, Inc. — Building 41 Specifications. Style 306,
<br /> Width, 60', Height 18', Length 122', Truss Spacing 8', Roof Pitch 4112, Lower
<br /> Chord 0112, Peak Height 29' 6.5", Soffit Height 18' 9". Pages 1 of 7, Submitted
<br /> by: Steven Marino, Sales Consultant.
<br /> 4. Drainage Calculations: 20 Evergreen Circle, Prepared by: Down Cape
<br /> Engineering, Proposed Building and Parking Lot, Mashpee, MA. Dated: 9-13-
<br /> 2018,Prepared for: Capewide Construction. Signed by: Dan Ojala, Civil Engineer,
<br /> No. 46502.
<br /> 5. Conditioned on all Town.Department comments read into the record.
<br /> 6. Conditioned that the plans are reviewed and approved by Charlies Rowley,
<br /> Consulting Engineer. That all fees will be paid by the applicant prior to the
<br /> issuance of a building permit.
<br /> 7. Conditioned that any changes or alterations made to the specified use to either
<br /> building shall be approved by the Zoning Board of Appeals.
<br /> 8. Conditioned upon, no building permits will be issued until the Building
<br /> Commissioner receives confirmation in writing from the Planning Board that cash,
<br /> security, or performance bond was posted and the lots have been released.
<br /> Mr. Gould seconded, yes, Mr. Furbush yes, Mr. Blaisdell, yes, and Mr. Pittsley, yes. All
<br /> were in favor of the industrial project located at 20 Evergreen Circle.
<br /> 12
<br />
|