Laserfiche WebLink
5 <br /> letter of non-compliance was sent to Judith and Steven Fivers on Judy 25, 2013, with no response. <br /> This request stated that a professional must be hired to design the repair of the system. A letter dated <br /> September 23, 2013, scheduling the condemnation hearing for this evening was mailed to the Fivers. <br /> Judith Fivers of 87 Lighthouse Lane introduced herself to the Board. <br /> On October 4, 2013, Mr. Harrington spoke to Mrs. Divers and discovered that there were financial issues. <br /> Mrs. Fivers stated that the septic system has been pumped every two years and did not have problems <br /> with the system. Glen Harrington commented that once a system is observed in failure, it is deemed <br /> failed. lir. Harrington informed Mrs. livers that she could receive financial aid through the Barnstable <br /> County Loan Program and also the USDA. <br /> The Board members suggested that Mrs. fivers contact the USDA for grants once the government <br /> returns to work. if this option is not feasible, Mrs. Fivers should contact the Barnstable County Loan <br /> Program. A final option may be to have the Town of Mashpee provide a loan to the homeowner. <br /> Lucy Burton made a motion that the Board of Health continue the Title v Condemnation hearing for 87 <br /> Lighthouse Lane until November 13, 2013. Burton Kaplan seconded the motion. The motion was <br /> unanimously approved. <br /> 7:25 PM — Michael Pimentel, J,C. Engineering, Inc—Title V Variance—240 surf Drive. <br /> Michael Pimentel of J.C. Engineering, Richard hard Capen of Capewide Enterprises, and John McGrath, <br /> homeowner of 240 Surf Drive, introduced themselves to the Board. <br /> Glen Harrington commented that a plan was prepared for the repair of the failed Soil Absorption System. <br /> at 240 ,surf Drive. It is proposed to be replaced with an H-20 pump chamber, a distribution bo , and 2- <br /> 500 <br /> gallon chambers with 4 feet of stone. several variances are requested including a Title v variance <br /> that requires state approval. This variance is due to the depth of the pump chamber which is greater than <br /> feet below grade. The other variances are setback variances to maintain the Soil Absorption System <br /> 100 feet from the Bordering vegetated Wetland to avoid a denitrification system. <br /> Lucy,Burton made a motion that the Board of Health approve the variances for 240 Surf Drive with the <br /> following conditions: <br /> 1. The property lime to be staked prior to-the soil Absorption System construction. <br /> 2. The Land Surveyor to certify the location of the Soil Absorption System. <br /> 3. The 40 mil liner to be placed as mitigation between the proposed Soil Absorption System and <br /> the 12-inch diameter concrete drainage pipe in the road. <br /> Burton Caplan seconded the motion. The motion was unanimously approved. <br /> NEW BUSINESS <br /> 1. sign Warrants. The Board members signed the expense warrants. <br /> . Review/Approve BOH Public session Minutes: September 25, 2013. <br /> Lucy Burton made a motion that the Burd of Health approve.the Public Session minutes of September <br /> 25, 2013. Burton Caplan seconded the motion. The motion was unanimously approved. <br /> 3. Request for a 2013 Food Establishment License: Laura's Horne Chin' —440 Nathan Ellis H . <br /> Tina Fournier of Laura's Home Cookin' introduced herself to the Board. <br /> Glen Harrington commented that this is a request for a 2013 Food Establishment Permit. The application, <br /> menu, Certified Food Manager Certification, Allergen Awareness Certificate, and the floor plans have <br /> 2 <br />