Laserfiche WebLink
*APPROVED DECEMBER 11, 2018* <br /> Capital Improvement Program Committee <br /> Minutes <br /> December 5, 2018 <br /> APPOINTMENTS & HEARINGS (con't) <br /> Planning and Construction (con't) <br /> Mashnee Middle Hi h School Irri otion Well Total Funds: $25,000 <br /> This project is for the replacement of the twenty year old original head/pump for the irrigation of <br /> all of the MMHS fields and due to the high iron content in the water the replacement is being <br /> expedited before the pump fails. Chairman Collins asked if there were any questions from the <br /> Committee and there were none. <br /> Mash ee Middle High School Stadium Field Artificial Turf Total Funds:$1,500,000 <br /> DPW Director Laurent presented the project as follows: This is replacement of the grass in the <br /> stadium at MMHS with artificial turf as well as reconstruction of the track surrounding the field. <br /> Since the school's construction in 1995, the number of athletic teams using the existing fields has <br /> more than doubled. Condition of the fields are comprised by this more intensive use during the <br /> spring and fall seasons; there is not a sufficient number of fields to allow any to rest except in <br /> winter and summer. Summer is also the only time for DPW to perform maintenance on the fields <br /> Which is not ideal because of weather factors which are not conducive to growing of grass. <br /> Replacement of the grass with artificial turf would allow increased use of the stadium field, <br /> especially as the field is lighted. In addition, there would be annual savings in operational costs in <br /> labor and materials as fertilization, irrigation, mowing, line painting, and re-sodding/seeding <br /> would not be required. <br /> The track around the stadium field has also exceeded its expected life and is in need of <br /> reconstruction. The track was resurfaced approximately 10 years ago and it is now in poor <br /> condition. Replacement would allow integration of new timing technologies recommended by <br /> MIAA for track. Noncompliant conditions for certain track events would also be addressed with <br /> reconstruction. <br /> This budget number will be investigated further, if there is support of this project because of the <br /> very wide range of cost for the various materials. <br /> If the fields were converted to an artificial turf they could be used more year round and wouldn't <br /> require the same amount of maintenance as the grass fields, it could also help out with the <br /> maintenance of the other fields as the artificial turf maintenance is not nearly as time consuming <br /> as reseeding or repairing a natural grass field. There is a potential for revenue from renting of the <br /> field due to the fact that the stadium field wouldn't have to be shut down for maintenance, the <br /> Town does not rent the fields at the school now. <br /> 6 <br />