My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/27/2014 BOARD OF HEALTH Minutes
>
2/27/2014 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2018 5:02:16 PM
Creation date
12/17/2018 2:28:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
02/27/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
leo •,�,,.7 <br /> � '. <br /> Town of Mashpeec <br /> 0 16 Great Neck Road North <br /> Mashee, Massachusetts 02649 <br /> BOARD of HEALTH PUBLIC SESSION <br /> Minutes of the Meeting f February 27, 2014 <br /> Bard Members Present: Also Present: <br /> Kalliope Egloff, Chair Glen Harrington, Health Agent <br /> Luer Burton, Co-Chair <br /> Burton Kaplan, Clerk <br /> Chair Kalliope Egloff called the meeting to order at :00 PM. <br /> NEIN BUSINESS <br /> 1. Request t for Decision: Bridges of Ma tepee, Request t for Altering Requirements f Water Quality <br /> Report. <br /> Glen Harrington commented that the Marsh pee Planning Board require a Water Quality Report be performed <br /> when a Special Permit is amended or required on commercial properties. Torte Fudala, Ma hpee Town <br /> Planner, has said that the Mahpe Planning Board did not expect additional wells to be installed at the <br /> Bridges of Ma tepee property. The Cape Cod Commission is requiring monitoring wells for the septic system, <br /> and the Ma hpee Planning Board thought the septic wells were sufficient to meet the requirements of the <br /> Water Quality Report.rt. However, it is up to the Ma hpee;Board of Health to make the decision regarding the <br /> cell , the location, and sampling analytes. not the Planning Board. <br /> The engineer from Stanteo requested a waiver of the wells with the following reasons: <br /> • A Phase 1 Environmental Site Assessment was conducted at the property and concluded no evidence <br /> of contamination. <br /> • The project only proposes development of approximately 5 acres of commercially zoned land, which is <br /> less than the 10 acres of development to trigger the Watb r Quality Report. The Mash pee Planning <br /> Board is still requiring the Water Quality Report. <br /> • The Cape Cod Com mi cion has required through-a d raft proposal that 3 monitoring wel Is be installed <br /> for regular testing, monitoring, and reporting for the septic system. <br /> Mr. Harrington stated that he was aware the wells were installed on this property for the Shaw's Supermarket <br /> project in 2001. Per Mr. Harrington's request the designer of a previous plan for the Planning Department, <br /> Rizzo o Associates, forwarded a plan of the property showing the locations of the wells,, that it had been <br /> surveyed, and a section of the Cape Cod Commission filing that shored Horsley Witten Group had taker <br /> samples from the installed wells. Joe Longo from Horsley Witten Group provided the well logs and the sample <br /> analysis taken from those wells in 2001, offering a baseline of information for the groundwater monitoring <br /> wells. <br /> Lucy Burton made a motion that the Board of Health approve the variance as requested for 482 Old Barnstable <br /> Road for the Water Qua Monitoring Wells with the condition that no further additional monitoring wel Is and <br /> the installation of the wells for the septic system be installed, sampled, and tested per the Cape Cod <br /> Commission requirements thereafter. The existing wells installed for the Shaver's Supermarket project should be <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.