My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/2012 SEWER COMMISSION Minutes
>
12/20/2012 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 9:17:19 AM
Creation date
1/2/2019 1:39:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Waquoit Bay MEP assessment includes the whole watershed and estuary,including the eastern portions, <br /> and the water quality model was completed based on nine years (2002-2010)of water quality data.9 The <br /> refinements in the whole system linked model likely play a significant role in the scenarios not meeting <br /> the thresholds for the Eastern Waquoit subembayments. <br /> The results of the whole system assessment also indicate that the proposed changes in the eastern portion <br /> of the watershed are insufficient on their own to meet the Threshold concentrations throughout the <br /> system. This result reinforces that water quality management in Waquoit Bay will have to be coordinated <br /> among all three towns in the watershed. <br /> 9 Howes B.,S.Kelley,E.Eichner,R. Samimy,J.S.Ramsey,D.Schlezinger,P.Detjens(2011). Massachusetts <br /> Estuaries Project Linked Watershed-Embayment Approach to Determine Critical Nitrogen Loading Thresholds for <br /> the Waquoit Bay and Eel Pond Embayment System,Towns of Falmouth and Mashpee,MA,Massachusetts <br /> Department of Environmental Protection.Boston,MA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.