My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/2012 SEWER COMMISSION Minutes
>
12/20/2012 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 9:17:19 AM
Creation date
1/2/2019 1:39:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
\ f SANDWICH <br /> BOURNE ¢ ` <br /> ram" <br /> BARNSTABLE <br /> F y x � <br /> €l ^" <br /> 7 _ <br /> FALM UTH <br /> f <br /> F t y <br /> LGGOn� Sev.e+Pbinnln04fee: <br /> Figure 5. Option 1C Scenarios. <br /> 74% of the total study area wastewater flow (2.0 MGD) is treated and discharged at 10 sites within the <br /> estuary watersheds: 18% (0.48 MGD)remains on standard septic systems, 1%utilize cluster denitrifying <br /> septic systems @ 19 mg/L TN, and the remainder of flows are treated to 3 mg/L TN and are discharged at <br /> ten (10) sites within the estuary watersheds. The majority of the treated effluent from Falmouth, <br /> Sandwich, and Barnstable sections of the study area is discharged outside of the watersheds (see orange, <br /> yellow, and green arrows, respectively). Site discharges to multiple discharge sites (i.e., Keeter, Pirates <br /> Cove, Willowbend, and Back Roads) are assigned on the same basis as in Option 1B. Modified from <br /> Figure 4 in GHD 2/15/12 memo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.