Laserfiche WebLink
CAPITAL PROJECT WORKSHEET FOR BUILDING NEEDS <br /> INCLUDING MAJOR REPAIRS OR UPGRADES <br /> Department Priority: <br /> Department Sewer Commission 1 of 1 Projects <br /> v <br /> Type of Project: Primary effect of project is to: <br /> (check one) Replace or repair existing facilities <br /> Improve quality of existing facilities <br /> x Expand capacity of existing services level/facility <br /> Provide new facility or service capacity <br /> 3 <br /> Project Description: <br /> Feasibility study and preliminary engineering for acquisition of the Willowbend and New Seabury wastewater treatment facilities,collection system,and dis <br /> Rationale for Project: x Removes imminent threat to public health or safety <br /> (check those that apply; x Alleviates substandard conditions or deficiencies <br /> elaborate below) x Responds to federal or state requirement to implement <br /> Improves quality of existing services <br /> Provides added capacity to serve growth <br /> Reduces long-term operating costs <br /> Provides incentive to economic development <br /> Eligible for matching funds available for limited time <br /> JI <br /> Narrative Justification: <br /> First phase of the CWMP and Nitrogen Management Plan will be to acquire and expand existing wastewater <br /> treatment facilities. This study will determine potential capacities, life cycle costs, expanded service areas, hydro <br /> geologic testing,for the two listed wastewater facilities, as well as improved treatment processes, collection and <br /> disposal areas. <br /> Cost Estimate(Itemize as necessary): Impact on Operating& Maintenance <br /> Costs or Personnel Needs <br /> $ 180,000.00 Planning/feasibility analysis Add personnel <br /> $ - Professional services Increased'O&M costs <br /> $ - Real estate acquisition Reduce personnel <br /> $ - Site preparation Decreased O&M costs <br /> $ - Construction <br /> $ - Furnishings &equipment Dollar Costs of Impacts If Known: <br /> $ - Other + annually <br /> $ 180,000.00 Total Project Cost (-) annually <br /> Identify Other possible funding sources(grants,etc): SRF loans <br /> Prepared by: Paul Gobell Date: 12/12/2012 0:00 <br />