Laserfiche WebLink
CAPITAL PROJECT WORKSHEET FOR BUILDING NEEDS <br /> INCLUDING MAJOR REPAIRS OR UPGRADES <br /> Department Priority: <br /> Department Sewer Commission 1 of 1 Projects <br /> Type of Project: Primary effect of project is to: <br /> (check one) x Replace or repair existing facilities <br /> x Improve quality of existing facilities <br /> x Expand capacity of existing services level/facility <br /> x Provide new facility or service capacity <br /> Project Description: <br /> Multi-year construction phase of wastewater collection and conveyance, treatment, and disposal facilities in compliance with <br /> the approved CWMP and Nitrogen Management Plan for the Town of Moshpee. <br /> Rationale for Project: x Removes imminent threat to public health or safety <br /> (check those that apply; x Alleviates substandard conditions or deficiencies <br /> elaborate below) x Responds to federal or state requirement to implement <br /> x Improves quality of existing services <br /> x Provides added capacity to serve growth <br /> x Reduces long-term operating costs <br /> x Provides incentive to economic development <br /> x Eligible for matching funds available for limited time <br /> Narrative Justification: <br /> Construction of new or improved wastewater treatment facilities to meet TMDL's imposed by the DEP <br /> and USEPA to remediate nutrient impacts of the estuaries in Waquoit and Popponesset Bays. <br /> Cost Estimate(Itemize as necessary): Impact on Operating&Maintenance <br /> Costs or Personnel Needs <br /> $ - Planning/feasibility analysis Add personnel <br /> Professional services x Increased 0&M costs <br /> $ 900,000.00 Real estate acquisition Reduce personnel <br /> $ 2,500,000.00 Site preparation Decreased O&M costs <br /> $ 73,100,000.00 Construction <br /> $ 2,700,000.00 Furnishings&equipment Dollar Costs of Impacts If Known: <br /> $ 800,000.00 Other + annually <br /> $ 80,000,000.00 Total Project Cost (-) annually <br /> Identify Other possible funding sources(grants,etc): SRF loans <br /> Prepared by: Paul Gobell Date: 12/12/2012 0:00 <br />