Laserfiche WebLink
NO"_ MEMORANDUM <br /> March 15, 2011 <br /> To Tom Fudala, Jack Malarkey <br /> From Jeff Gregg, P.E., Darlene Zelinski�T ' Tel 774-470-1639 <br /> Subject Mashpee Notice of Project Change Effort Job No. 8612001 <br /> This memo is written to summarize the anticipated effort of filing a Notice of Project Change (NPC) for the <br /> Mashpee Watershed Nitrogen Management Plan. <br /> An NPC is required for either a significant change or a lapse in time. The changes that constitute a <br /> significant change include expansion of dimensions of a project, an increase in the level of impacts <br /> previously reviewed, triggering new review thresholds, change in expected dates, new permit or financial <br /> assistance applications, or a change that prevents or delays realization of environmental benefits. The lapse <br /> in time NPC is required when more than three years have elapsed between the publication of the <br /> Environmental Notification Form and the publication of the notice of availability of an EIR. <br /> In this case we only anticipate an NPC for lapse of time, therefore it would involve the following: <br /> • Approximately 20 pages of the NPC document— NPC form, previous Secretary's certificate, USGS <br /> map, distribution list <br /> • Distribution of an estimated 30 copies of the NPC document <br /> • Engineering time to collect the documentation, complete forms, review and print <br /> • Administrative Assistant time to package and mail the documents <br /> We estimate a $2,000 effort to complete this task. Because this is a lapse of time NPC filing, we did not <br /> include effort associated with addressing additional comments or requests as a result of this filing. <br /> GHD Inc.1545 lyannough Road Hyannis MA 02601 USA <br /> T 1 508 362 5680 F 1 508 362 5684 E hyamail@ghd.com W www.ghd.com <br /> (3186112001 ftreementMotice of Project Change\NPC 20111NPC 2011 Effort Summary.doc <br />