My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/15/2011 SEWER COMMISSION Minutes
>
3/15/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2020 11:17:00 AM
Creation date
1/2/2019 1:50:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f.r. mahony& associates, inc. <br /> tel. 781.982.9300 <br /> fax. 781.982.1056 <br /> water supply and pollution control equipment <br /> info@frmahony.com <br /> 273 Weymouth Street> Rockland,MA 02370 www.frmahony.com <br /> Back Road Site Collection Area <br /> This project proposes to collect wastewater from approximately 440 housing units <br /> and transport to the Back Road Treatment Site. <br /> The highest Total Dynamic Head generated is approximately 118 feet primarily <br /> resulting from friction loss in the pipeline. This is well below our pump's continuous- <br /> run rating of 185 ft, and well within its intermittent, i.e., normal, operating range. Flow <br /> velocity throughout the system meets or exceeds 2 fps. These characteristics and <br /> low retention time indicate that this will be a reliable, low-maintenance system. <br /> t <br /> a - <br /> z <br /> b <br /> 30 DuPaul Street 41 Bayberry Hill Road <br /> Southbridge, MA 01550 W.Townsend, MA 01474 <br /> tel. 508.765.0051 tel. 978.597.0703 <br />
The URL can be used to link to this page
Your browser does not support the video tag.