Laserfiche WebLink
March 14,2011 <br /> Budgetary Low Pressure Sewer System Costs <br /> HERITAGE PARK COLLECTION AREA <br /> uantit Description Unit Cost Installation Sub Total <br /> Valves 25 Clean Out 1 $2,500.00 1 0.00 $62,500.00 <br /> $62,500.00 <br /> Pumps 267 1 Lateral(Boundary)Kits $150.00 0.00 $40,050.00 <br /> 267 Simplex Grinder Pump Stations $2,800.00 0.00 $747,600.00 <br /> 267 Pump/Panel/lateral installation $7,500.00 0.00 $2,002,500.00 <br /> $2,790,150.00 <br /> Piping 10,100 1 2.00"Pipe $50.00 0.00 $505,000.00 <br /> 19,450 i 3.00" Pipe $50.00 0.00 $972,500.00 <br /> 950 4.00"Pipe $50.00 0.00 $47,500.00 <br /> 3,900 5.00" Pipe $50.00 0.00 $195,000.00 <br /> $1,720,000.00 <br /> Other 0 Contingencies $0.00 0.00 $457,265.01 <br /> i <br /> 0 CONTRACTOR OVERHEAD 1 $0.00 1 0.00 $457,265.01 <br /> $914,530.01 <br /> Number of Connections 267 <br /> Total Per Connection $17,126.03 Total(w/o other) »»»»»» $4,572,650.00 <br /> Grand Total Per Connection $20,551.24 Grand Total(including other)»»»»»» $5,487,180.01 <br /> Note: The System Costs above are based on piping sized for,and Grinder Pumps manufactured by Environment One Corporation. <br /> Page l F:\FRMA\Projects\EONE PROJECTS\Massachusetts\Mashpee\MASHPEE SEWER PLAN\HERITAGE PP <br />