Laserfiche WebLink
March 14,2011 <br /> Budgetary Low Pressure Sewer System Costs <br /> HIGH SCHOOL AREA COLLECTION AREA <br /> uantit Description Unit Cost Installation Sub Total <br /> Valves 30 Clean Out $2,500.00 0.00 $75,000.00 <br /> $75,000.00 <br /> Pumps 731 Lateral(Boundary)Kits $150.00 0.00 $109,650.00 <br /> 731 Simplex Grinder Pump Stations $2,800.00 0.00 $2,046,800.00 <br /> 731 Pump/Panel/lateral installation _ $7,500.00 0.00 $5,482,500.00 <br /> $7,638,950.00 <br /> Piping 11,610 2.00"Pipe $50.00 0.00 $580,500.00 <br /> 29,530 3.00"Pipe $50.00 0.00 $1,476,500.00 <br /> 14,680 4.00"Pipe $50.00 0.00 $734,000.00 <br /> 9,750 5.00"Pipe $50.00 0.00 $487,500.00 <br /> 2,000 16.00"Pipe $50.00 0.00 $100,000.00 <br /> $3,378,500.00 <br /> Other 0 Contractor Overhead $0.00 0.00 $1,109,245.02 <br /> 0 Contingencies $0.00 0.00 $1,109,245.02 <br /> $2,218,490.03 <br /> Number of Connections 731 <br /> Total Per Connection $15,174.35 Total(w/o other) »»»»»» $11,092,450.00 <br /> Grand Total Per Connection $18,209.22 Grand Total(including other)»»»»»» $13,310,940.03 <br /> Note: The System Costs above are based on piping sized for,and Grinder Pumps manufactured by Environment One Corporation. <br /> Page 1 F:\FRMA\Projects\EONE PROJECTS\Massachusetts\Mashpee\MASHPEE SEWER PLAN\High School sit <br />