Laserfiche WebLink
Popponesset Bay <br /> Massachusetts Estuaries Project Technical Report <br /> • Identified water quality problems in <br /> Massachusetts Estuaries Project the Bay <br /> Linked Watershed-Embayment Model to Determine Critical <br /> Nitrogen Loading Thresholds for Popponesset Bay, Problem: too much nitrogen <br /> Mashpee and Barnstable,Massachusetts • <br /> 4a <br /> 4 t> <br /> Used three years of data to <br /> develop a linked watershed <br /> estuary model <br /> Ai Model can be used to develop <br /> M1 t, <br /> solutions to fix the problem <br /> � Analysis formally accepted by <br /> University of Massachusetts Dartmouth Massachusetts Department of M a s s D E P and U S E PA <br /> School of Marine Science and Technology Environmental Protection <br /> FINAL REPORT—SEPTEMBER 2004 • Popponesset Bay MEP Technical <br /> Report finalized in September <br /> ry� _ 2004 <br /> Popponesset Pilot Project Slide 5 <br /> OJP P <br />