My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/21/2011 SEWER COMMISSION Minutes
>
6/21/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 9:59:11 AM
Creation date
1/2/2019 1:52:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 3 <br /> TOWN OF MASHPEE <br /> HYDRAULIC LOADING TESTS <br /> CONSTANT HEAD TESTING RESULTS <br /> Final Final Basin Infiltration Allowable <br /> Stabilized Stabilized Area Capacity Loading Rate <br /> Basin Flow Rate in gpm tip Flow Rate in gpd Square Feet(2) Is . ft gpd/sq. ft(3) <br /> Test Basin#1 39 55922 78 717 72 <br /> Test Basin#2 47 67500 1 78 1 865 87 <br /> (1) To be conservative, based on lowest flow rate recorded <br /> (2) Area = 3.14 x(5 ft)2 <br /> (3) Based on EPA guidance (Process Design Manual - Land Treatment of Municipal Wastewater) <br /> indicating loading rates should be based on 10-15% of measured basin infiltration rates <br /> Minimtam value <br /> _..._. <br /> G:\86\12001\Hydraulic Load Tests\Data\Test Data.xls <br /> DRAFT Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.