My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/30/2011 SEWER COMMISSION Minutes
>
8/30/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:35:24 AM
Creation date
1/2/2019 1:56:44 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/30/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Environmental Engineers/Consultants <br /> 8ME <br /> 9 I.d e- I lill Pwd <br /> Ncwton, ;IM, L(I I L h t s 0?167 <br /> (617) 96/-19 i <br /> Porr<Chlc. (61/) 729-4191 <br /> 1 u:: (617) :3,) `iti77 <br /> 1 -mail: pio(;t'I,onii)aidoAssocisucs.com <br /> MEMORANDUM <br /> To: Town of Mashpee Date: June 1, 2010 <br /> Board of Sewer Commissioners <br /> ■ F. Thomas Fudala, Chairman ■ Jack Malarkey <br /> ■ Burton Kaplan, Vice Chairman ■ Oskar Klenert <br /> ■ Ralph Marcelli, Clerk ■ Joseph N. Lyons <br /> ■ Thomas O'Hara <br /> From: Pio Lombardo, P.E. <br /> Lombardo Associates, Inc. (LAI) <br /> Re: Groundwater Nitrogen Treatment— NitrexTm PRB <br /> Groundwater Nitrogen Treatment <br /> The LAI scenarios proposed removal of wastewater nitrogen sources only. The NitrexTm PRB has <br /> the added benefit of treating all sources of groundwater nitrogen - including the land use portion. <br /> As can be seen from the Table 1, between 15% - 55% of the total required removal is from land use <br /> nitrogen. This situation offers the potential to treat a significant amount of groundwater nitrogen in <br /> lieu of collection, treatment and dispersal systems. Also, the Land Use Loads are significantly <br /> larger than the treated wastewater Return Loads, which represent the nitrogen returned to a <br /> watershed through dispersal of treated effluent. This indicates that there is no need to locate <br /> remote dispersal sites if sufficient land use nitrogen load can be treated — thereby increasing <br /> dispersal/reuse site selection flexibility. <br /> Table 1 also shows that the nitrogen removal requirement associated with buildout is a significant <br /> percent of the total N-removal requirement, which may affect the timing of needed nitrogen removal <br /> improvement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.