Laserfiche WebLink
u <br /> planning area, but did not include the Town of Sandwich. However, it was understood that the Town of <br /> Sandwich would be included in any alternative. <br /> These layouts were then used to create two(2)Options(Nos. 1 and 2)that were presented to the Sewer <br /> Commission in the Spring of 2011. Based on these two options for addressing nitrogen within the project <br /> planning area,the Sewer Commission offered several suggestions.These were considered and the options <br /> were transformed into Option I and Option 1 B,as described in subsequent sections. <br /> The general comments from the Sewer Commission relative to these initial two options helped form Options <br /> I and 1 B,and were as follows: <br /> • Use of Rock Landing—consider one option of relocating the wells from that location and a second <br /> alternative where Rock Landing site was not available. <br /> • Maximize use of New Seabury Golf Course(under one scenario,the other should focus on it not <br /> being available). <br /> • Maximize use of Willowbend Golf Course. <br /> • Sewer Popponesset Island under all options. <br /> • Possible pilot project within the Pirates Cove neighborhood using NitrexTM technology or permeable <br /> reactive barrier(PRB)technologies. <br /> • Look at options of Falmouth,Barnstable,and Sandwich dealing with their nitrogen loads outside of <br /> the watershed.However,in subsequent meetings the Sewer Commission requested a second look <br /> at the portion of Falmouth east of the Quashnet/Moonakiss River in Mashpee (as originally <br /> presented to the committee),therefore this will be included in both alternatives. <br /> • Sensitivity analysis of improved attenuation'south of Santuit Ponds and Quashnet Bogs, and <br /> possibly through Willowbend. <br /> • Improve all small WWTF's to 3 mg/L. Initially, the approach by GHD was to only consider <br /> improvements to larger facilities as it would likely be more cost effective in the short term relative to <br /> the amount of nitrogen load discharged by these smaller facilities. <br /> • 1(A systems for now will continue to be considered at 19 mg/L,however,higher performances can be <br /> achieved(as 10 mg/L was used initially),but this approach of 19 mg1L remains consistent with the <br /> MassDEP approval process for these systems. <br /> Additional assumptions by GHD'used in the analysis: <br /> • Sites being considered(outside of existing W WTF discharge sites)include: <br /> o Site 2(Ashumet)for treatment only <br /> o Site 4(Transfer Station)for treatment and discharge <br /> o Site 6(Keefer)for treatment and discharge <br /> o Backroads site for treatment and discharge <br /> o Site 7(New Seabury)for discharge <br /> 2 <br />