My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/18/2011 SEWER COMMISSION Minutes
>
10/18/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:05:51 AM
Creation date
1/2/2019 2:06:12 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
10/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• The development of the recommended plan is where the implementation and phasing approach of <br /> the project will be developed, which will focus on addressing current wastewater needs with the <br /> understanding that proposed facilities will need to be able to accommodate future growth. <br /> • It is understood that the current economic climate and population trends across the Cape are flat; <br /> however any future plan will have to consider that over a 20 year period these conditions will <br /> change,and will need to be flexible in both a positive(growth)and negative(declining)direction.Per <br /> the 2010 Census, Barnstable County saw a 2.9% decrease in population while Mashpee <br /> experienced a growth of almost 9%over that same period. <br /> G:18 641 20 0 7 10orrespondencelMemos120Y 1G4c—dos Description-O-b.AI-DRAFT Scenarios 2011.DOC 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.