Laserfiche WebLink
photometric and landscape plans. Mr. Creedon noted that the proposal remains as a 20,000 square <br /> foot industrial building. <br /> Mr. Eddy discussed the site plan, noting that the lot size was 1.91 acres with frontage on <br /> Commercial Street and Industrial give. The site will provide for 61 spaces with an entry <br /> onto Commercial Street and a second ice on buhmsbial Drive. The sidewalk around the <br /> building has been revised and air conditioning con&nw utas have been added on the south end of <br /> the building, which reduced the paring space count. Handicap parking was adjusted in order to <br /> ensure accessibility and a fire Lane was added at the south end of the building. The trash and <br /> recycling area was enclosed and located in the northeast corner. Mr. Fudala noted that the original <br /> plans featured an entrance closer to the conwr of Commercial and Industrial, but was relocated at <br /> the:request of the Fire Department. <br /> Regarding the grading and dram plan, Mr.Eddy statod that the site-was generally level and that <br /> the building would sit on a slab on grade. The grading for the drainage will be on the high side of <br /> the north end of the property and will feature a glass swale, catch basins and bioretention forebays <br /> and bioretention infiltration facility. Mr. Eddy noted that the system meets and exceeds MA IEP <br /> stormwater mana ement policies and Mashpee r e rn eats. Roof drainage is connected to <br /> underground roof drains that will discharge directly to the stormwater marwgement area. Mr. <br /> F'uda,la inquired whether a man ent planhad bem prepared for the stonnwater facilities and Mr. <br /> Eddy responded tha1t the o&M was located on the plan- Mr. Fudafa requested that a separate <br /> document be submitted. <br /> Mr. Eddy stated that the Linty plan was straight forward with a fire Wspfinkler connection and <br /> domestic.water connection on the est corner of the property. The spfinkler room and Fire <br /> Department tment c nn ction was loomed on the north end of the buildim . A previously designed I <br /> septic system had been approved by the Board of Heath. Mr. Edddy stated that the routing of the <br /> secondary electric had been reloczud around the grass swale area in response to concerns expressed <br /> by Mr. Rowley, and additional c were made to the plans as refected in the July 6 letter from <br /> 1r. Rowley. There was discussion regading signage cautioning about the curb cut and the location <br /> of handicap access. Mr. Balzanni* recommended that signage be placed in units 1, 2v 6 and ' : <br /> 11r, ludala requested clarieation rem uses and the square footage of usage being requested, <br /> which was discussed-at De6gn Review,b A not concluded, Mr. Fudala stated that alternatives were <br /> being sought for parlang. The Chair inquired whether there was sufficient parr available for the <br /> proposed uses and Mr. Fudaia shed thatparb e based on the use table. Mr. Eddy <br /> confirmed that office would be the most nmtri <br />