My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/27/2018 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
>
11/27/2018 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:41:54 PM
Creation date
1/23/2019 11:33:12 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee - V�akeb Lake Nlana ement <br /> ;Y <br /> . Comm ee; <br /> November <br /> 27 2018 <br /> lYlaftee.Town Tall <br /> Meeting called by Debi McManus <br /> Type of meefng Monthly <br /> Secrqtaty Barbara B.Nichols <br /> A#tendees Members: Brian Mauro, Mike Rapacz, Barbara Nichols <br /> Guests: <br /> The minutes of the October 23, 2018 meeting were accepted as written after a motion by Brian Mauro <br /> and second by Mike Rapacz. <br /> Agenda topics <br /> Agenda typic 177.7:1 Lake le ell Rzver outflow <br /> _ . <br /> Discussion: Barbara checked the lake levels on November 1St andl5th. It was 55.4 and 55.5 feet above <br /> sea level with 13.5 and 15.5 inches flowing over the board closest to the lake. There were 11 and 13.5 <br /> inches of water in the stream by the stairs. Levels were reported to Drew McManus in Conservation. <br /> There has been no movement on cutting back the poison ivy and brush along the path to the cage. <br /> Barbara measured 7.72 inches of rain in her rain gauge during the month of October 15th to November <br /> 15th. <br /> Conclusions: The lake remains very high for fall due to increased precipitation. <br /> [Agenda topic 2J Fa11 Newsletter <br /> Discussion: Barbara sent the completed newsletter to Christine Willander for polishing and to the Town <br /> Manager who approved it November 7th. Fifteen copies were printed and some displayed in the Town <br /> Hall lobby. The newsletter was then sent to David Delvecchio and it was posted on our committee site on <br /> the Town's website on November 15th. <br /> Conclusions: The Fall newsletter is completed and available on the web site and in print in the rack in the <br /> lobby. <br />
The URL can be used to link to this page
Your browser does not support the video tag.