My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/14/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
01/14/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 5:02:46 PM
Creation date
1/25/2019 11:04:46 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
01/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
removed outside of the watershed or treated to the levels required based on the MEP <br /> modeling results. <br /> – Collection system expansion (Main Street/Route 130) Subarea T to Site 4. <br /> -- Collection system expansion to Subareas A and C (Seconsett and Monomoscoy Islands). <br /> – Collection system expansion to Childs River watershed portion of Subarea H. <br /> ® End of Phase compliance reporting—consider updating MEP Model runs (landuse and <br /> hydrodynamic models) and MEP calibrate with water quality and benthic flux sampling as needed. <br /> This schedule represents one possible future where the PPA is forced to implement traditional <br /> infrastructure to serve those areas outside of the Quashnet River Watershed where shellfish aquaculture <br /> is being pursued to reduce nitrogen loadings within the affected bays. Development of MOUS with <br /> neighboring towns will be necessary to establish a potential phasing strategy based on each town's <br /> specific needs. Towns may address other "neighborhoods" within the watersheds based on each <br /> individual town's planning efforts and approach. Monitoring and modeling efforts at the five-year intervals <br /> will be necessary to establish the extent of nitrogen removal following shellfish aquaculture <br /> implementation. <br /> ES.8 Next Steps <br /> Due to the long duration and complexity of this project as well as the inclusion of a number of different <br /> stakeholders who are critical to the success of achieving the TMDLs, there are several items that will need <br /> to be addressed following the submittal of the plan. This is a function of several different initiatives that are <br /> proceeding concurrently with this project, most notably: <br /> • The ongoing 208 Planning Process going on through Barnstable County and the Cape Cod <br /> Commission. <br /> • Joint Base Cape Cod and Mass Development evaluations of the existing utilities (electrical, water, <br /> sewer, etc.) at the existing base and ownership discussions regarding these utilities. <br /> • Town of Barnstable Nutrient Management Planning efforts Town-wide, as they are related to the <br /> portions of Cotuit within the PPA. <br /> • Town of Falmouth Comprehensive Wastewater Management Planning efforts related to the <br /> "South Coast' embayrnents including Waquoit Bay. <br /> • Town of Sandwich Comprehensive Planning efforts and future development projects being <br /> evaluated. <br /> • Commonwealth of Massachusetts planning efforts related to the use of alternative approaches <br /> and technologies related to nutrient removal (primarily on Cape Cod, Southeastern <br /> Massachusetts, and Buzzards Bay). <br /> With this in mind, there are several key steps/decisions/directions in wastewater and nitrogen <br /> management planning that will help in the completion of the Recommended Plan and its implementation <br /> over the next several decades. <br /> 8612001 A Town of Mashpee sewer Commission ES-17 <br /> Final Recommended Plan/Final Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.