My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/14/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
01/14/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 5:02:46 PM
Creation date
1/25/2019 11:04:46 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
01/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These include: <br /> • Cape Cod Commission and MassDEP direction on the enforcement and permitting issues <br /> associated with the TMDLs, such that each town within the Project Planning Area will have a clear <br /> understanding of their regulatory obligation and therefore will be able to create the necessary <br /> structure to monitor, manage, and enforce TMDL compliance, whether that be through a Board of <br /> Health, Sewer Commission, Department of Public Works, Sewer Department, Sewer District, or <br /> other structure. This is outside the control of the Town(s) and Districts related to this project. <br /> • Development of a long-term monitoring program. Because the groundwater travel patterns, times, <br /> and estuary flushing conditions are influenced by a number of factors, an appropriate plan will <br /> need to be developed by the Towns and the regulatory agencies to monitor the effectiveness of <br /> the plan in meeting the TMDLs. <br /> • Continue to discuss ownership of collection systems, management options, development versus <br /> build-out impact on costs. (This will be an ongoing function of implementation as the Town/District <br /> will not need to own all facilities initially, but should have documents in place to ease the transition <br /> when those facilities are required to be transferred, if necessary). <br /> • Financial planning of phasing and bonding in increments. (This cannot be determined until the <br /> Water/Sewer District structure and rate schedule is established and ownership of existing facilities <br /> is resolved; this will be an ongoing part of implementation.) <br /> The following items will need to be completed as part of the plan's implementation: <br /> • Identification of the plan's funding mechanism (betterments, taxes, rates, and fees). <br /> • Private facilities acquisition/ownership/operations/maintenance. <br /> • Additional effluent disposal site evaluations and hydrogeological evaluations. <br /> • Securing of facility, cluster, and PRB sites and pumping station locations. <br /> • Development of Sewer Regulations. <br /> • Development of Sewer Rate Structure. <br /> • Phosphorus removal considerations (upgradient of fresh water systems). <br /> • Development of a detailed Adaptive Management Plan and long-term TMDL monitoring (for fresh <br /> and salt water). <br /> • Town/District rules and bylaws related to projected wastewater flows (growth/flow neutral). <br /> • Introduction of new Mashpee Water and Sewer District to neighboring communities related <br /> departments. <br /> • Cost sharing between neighboring communities and districts and MOU development for all <br /> aspects of the project. <br /> • Scoping and development of subsequent implementation and planning steps including: adaptive <br /> management and additional studies. <br /> • Completion of the Feasibility Study related to the Quash net/Moo nakis River. <br /> 8612001.4 Town of Mashpee sewer commission ES-18 <br /> Final Recommended Plan I Final Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.