My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/14/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
01/14/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 5:02:46 PM
Creation date
1/25/2019 11:04:46 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
01/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ES.3 Public Participation <br /> The Mashpee Sewer Commission has actively engaged in public participation throughout the planning <br /> process, with a focus on educating the public on the issues of wastewater and nutrients as they relate to <br /> the watersheds of Popponesset Bay and Waquoit Bay's east basin, as well as the remaining portions of <br /> Mashpee within the Project Planning Area. The Commission has actively encouraged residents, Town <br /> leaders„ business leaders, regulators, and adjacent communities within and outside of the planning area to <br /> actively participate in the planning process. The public outreach program consists of several components, <br /> including: <br /> • Monthly Sewer Commission meetings—televised and open to the public. <br /> • A Community Advisory Committee (CAC)—as appointed by the Board of Selectmen. <br /> m Public presentations on various phases and aspects of the project and related efforts through the <br /> Town and Region. <br /> a Development of public education materials: <br /> - Project web page: www.mashpeewaters.com, including project description, meeting minutes, <br /> reports, contacts, and other project related information. <br /> - Project kiosk; focusing on the problem and where to get additional information. <br /> - Informational flier (first of two): the first focused on the nitrogen issues facing the PPA and <br /> general information on the project. The second will be coordinated with the submittal of the <br /> Final Recommended Plan. <br /> Participation in a formal MEPA/CCC environmental review process. <br /> Participation in several "Pilot" projects supported by Barnstable County and other regional <br /> agencies. <br /> • Joint meetings with Barnstable, Falmouth, and Sandwich to review the project and the efforts <br /> being made by all parties to address nitrogen in these watersheds and throughout the region. <br /> Participation in the Cape Cod Commission 208 Planning process. <br /> ESA Summary of Previous Evaluations <br /> Throughout the planning process the CWMP has evaluated several alternatives/options and has <br /> performed additional related evaluations in the process of developing a Recommended Plan. <br /> Fallowing the release of the Needs Assessment Report, the Mashpee Sewer Commission identified five <br /> different management scenarios for evaluation and analysis. The 2008 Draft Alternative Scenarios Report <br /> discusses the general characteristics of each scenario and the basic methodology used to evaluate each <br /> scenario. <br /> The five scenarios identified were: <br /> • Scenario 1—No expansion of existing wastewater treatment facilities. <br /> ® Scenario 2—Upgrade and expansion of existing facilities to a practical extent. <br /> 4 Scenario 3/3R—Cluster Scenario (prepared by Lornbardo Associates Inc.). <br /> 8612001.4 Town of Mashpee Sewer Commission ES-3 <br /> Final Recommended Plan/Final Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.