Laserfiche WebLink
FOR <br /> ES.1 Background <br /> The purpose of the Final Recommended Plan and Final Environmental Impact Report (FRP/FEIN) is to <br /> present the recommendations of this planning process to address the nitrogen Total Maximum Daily <br /> Loads (TMDLs) established for Popponesset Bay and Waquoit Bay's eastern basin, and to discuss the <br /> mitigation measures and implementation approach for Mashpee (and its neighboring communities within <br /> the project planning area) to address these needs as identified in previous documents. These <br /> recommendations as they relate to Mashpee will then be managed through the Mashpee Water and <br /> Sewer District and the Town of Mashpee. <br /> The Town of Mashpee initiated the process to develop a Watershed Nitrogen Management Plan (WNMP) <br /> in 1999 in order to address the nitrogen impacts to coastal embayments and to evaluate options for <br /> restoring those embayments through the development of a Comprehensive Wastewater Management <br /> Plan (CWMP). Because the contributing areas to the estuaries (watersheds) are shared by multiple towns, <br /> Mashpee's WNMP Project Planning Area (PPA) includes the Town of Mashpee and the portions of <br /> neighboring towns (Barnstable, Falmouth, and Sandwich) that fall within the Popponesset Bay and <br /> Waquoit Bay East Basin watersheds. The PPA is illustrated in Figure ES-1. The WNMP/CWMP is <br /> intended to provide an environmentally and economically sound plan for nitrogen reduction, wastewater <br /> treatment, and treated water recharge in the planning area. <br /> As stated previously, the CWMP is the culmination of multiple documents generated during the planning <br /> process. <br /> ES.2 MEPA Planning Documents <br /> In September of 2001, the Town of Mashpee, through the Mashpee Sewer Commission, entered into the <br /> MEPA process by filing their Environmental Notification Form (ENF) and MEPA Unit/Cape Cod <br /> Commission Joint Review Process Application Form. That document identified several major deliverables <br /> to be submitted for review through this process in addition to the Notice of Project Change submittals <br /> required due to the extended nature of this project. <br /> Those deliverables, which have been submitted, included: <br /> 1. Needs Assessment Report (NAR)—issued in April 2007 <br /> 2. Technology Screening Report—issued in November 2007 <br /> 3. Draft Alternative Scenarios Analysis and Site Evaluation Report—issued in March 2008 <br /> 4. Two (2) Notices of Project Change (in 2007 and 2012) <br /> 5, Alternatives Screening Analysis Report (ASAR)—issued in August 2013 <br /> 6. Draft Recommended Plan/Draft Environmental Impact Report (DRP/DEIR)—issued in June <br /> 2014 <br /> Following the submittal of the DRP/DEIR, MEPA issued their most recent certificate dated September 12, <br /> 2014, a copy of which is included in Appendix 1-1. That Appendix also includes the most recent response <br /> to comments. <br /> 8612001.4 Town of Mashpee Sewer Commission ES-2 <br /> Final Recommended Plan/Final Environmental Impact Report <br />