Laserfiche WebLink
' <br /> Meshpee P1anning Board -2- 9/20/95 <br /> Ferragamm said the Board can sympathize with Mr . Pocknett ' s <br /> predictament , but he' s not clear as to the Board' � �bility tm <br /> h*�lp him out as ther�' s a pro�ess to go through, which �� placing <br /> a eecurity or bond for a re1ease of the covenant . Mr . Fudala <br /> agreed that a release of the ccwenant requireo a perfo�mance <br /> gmarantee in place of the co«enamt , and the Board dmesn' t <br /> usually release lots until the road is dome. <br /> Mr " Pocknett said the shouIders and seeds and <br /> 1oams, then the topcoat will be put down" He said the drain�ge <br /> was inspected and passed. Mr . Pocknett said the Building <br /> Inspector told him he needed the covenant rzeleased before he <br /> cou1d isf:�ue a building permit . �hairman Ferragamo �aid the <br /> prmb1em is if the road never g�ts finishedth <br /> , ere' s no �ecurity <br /> to finish Uhe roadway. He said he didn' t have a problem on <br /> the understanding that if th�re' s a Mr . Pc�knett wcm' t <br /> come back to the Town to soIve it . Chalrman Ferragamo wanted it <br /> macje clear that this is the only lot that will be re1aased here, <br /> even if there are other hard�hips. Mr . Coffey asked lf other <br /> pec[pIeare w�iting to build. Mr . Pocknett said no one e1se 1s <br /> ready to build and he' s had his wel1 put in. <br /> MOTION made by Mr . Coffey and SECONDED by Mr . Balzarini <br /> to release the covenant on lots 11 and 1G, and relese <br /> �o be 1­ie1d by Mr . Fuda1a until. such time as he confirms <br /> with the Oui1ding Inspector that the only thing holding <br /> UP the buildingpermit is the covenant not bc-�ing <br /> releaoaed, S8 VOTED. <br /> The Board asked Mr . Pocknett to come back tm the October 18 <br /> meetlng and give the Board a status r�port . <br /> i <br /> On a MOTION made by Mr . Coffey and SECONDED by Mr . ! <br /> Belazarini it was unamimomm1y voted by roll call vote � <br /> of Mr . Ferr�gamm, Mr . �offey, Mr . Ba1zariniv <br /> Meijering and Mr11 go into executive ! <br /> session for t pmrpose of considering strategies <br /> reg�rd�ng potential litigation against the Towm et 7x12 | <br /> p. m. , and tm return to open session after . <br /> � <br /> Open sess1on was reconvened at 8: 15 p" m. � <br /> Aopllcantx Lawrenc� �u1ivan/Capev & Is1ands Eng�neeVing � <br /> L. cationx "White 9ater ES ates" , TauruS Road/AsSessors Map <br /> parce1 4 | <br /> Re�uest : Approva1 of Definitive Plan (decision required by Spt . ! <br /> 20 meeting) . Continued from September 6. i <br /> / <br /> Chairman Ferr�gamm opene� the hearing and asked Mr . Su11ivan .1. | <br /> | <br /> � <br />