My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/7/1997 BOARD OF SELECTMEN Minutes
>
4/7/1997 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 1:27:23 PM
Creation date
1/30/2019 1:25:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
04/07/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.. ,MAR-13-97 THU 08:42 P, 02 <br /> �y <br /> •J199� <br /> Change <br /> OWNER <br /> 0. <br /> AIA Document G701 Electronic Format ARCHITECT Lx <br /> CONTRACTOR (,x <br /> FIELD [� <br /> OTHER <br /> r <br /> PROJECT_ CHANGE ORDER N MPER: 033 <br /> i (name: address) <br /> Mqshne 1 i94 School <br /> Masbpe DA- TE: February 25,, 1997- <br /> O CONTRACTOR: <br /> (n , address) ARC T CT'S PROTECT XO: 94023 <br /> The Stone Buitcling Company COXTRACT D ATE: Njqy 8;j 99-5 <br /> 780.Allens Avenue <br /> Providence. R1 02905 CONTRACT F R: General Construction <br /> Th Contract i is g d a folio - : � _.� <br /> 1.Add additional wiring! r the.Gymnastum r rd,.p r Chanp_Estimate 065. dated2/17'97. <br /> =Add seven alvanized door transom pngl .per Charge Estimate 093,dated 2/21/97. <br /> . <br /> 3_ DeIet the irrigationgem from the Contract In the Ioc tion of thaided Ids, pe r Chan imate ISO. <br /> dated 9,' 09 , <br /> .,.A b lo Ckingalongg ro of e4e in B gilding Sectors C and D, p er Change Estimate x.15. dated 2/21/97. <br /> .Ren ait dared kctri atl pull box at the WWTP.per Coq E-stimate 129, dated 1/29197_ <br /> .Add partition, do.or and Frame to Tilt Room s C 16 8 and C 16 9# r change Estimate 156. dated 2117/97. <br /> Not valid until signed by the Owner,Architect and Contractor. <br /> The original (Contract Sum) was $18.090.000.00 <br /> Net changepreviouslyauthorized ChangeOrders $1.133,440.00 <br /> The(Contract Su Gu T • _ ;M, .; <br /> prior to this Charge Order was S19.223.440.0 <br /> THIS DOCUMENT HAS IMPORTANT LEGAI, CONSEQUENCES; CONSULTATJON WITH AN ATTORNEY 1 <br /> -15 <br /> ENCOURAGED W IT14 RRSPECT TO ITS COMPLETIONi I I ATI I . AUTI-TEN71CATTON OF THIS <br /> L ECTJZ ONICALLY DRAFTED AI A DOCUMENT MAY E MADE BY USING3 AIA DO .N ENT D401 <br /> A t A 170 Ci.'M N T Q701 -C11ANGE ORD.R-;037 EDITION-A 1-COPYXIGNT 1917_T H e AM+RICA 1NSTIMM!OF APC91TTR_,�" ,#1715 NBW Y ORK 11VE-UE.X,W,+ <br /> WAST ICtTON� T1.C�•-20006-5292.IVAILNING:UnUctmitd phnt"oprya,c vietat�s L.S.capyrjgr t!a ��d iS01eec to lc9al pro;awutivn.This dcrKuhiCrs w#I C1cc:;:'unicaSSy produced und-r <br /> lictns:num b4r 7P 700 1 ;9 atnc;,zea;t rcgrcduced imi;ho;sl violslian grad:7131197. <br /> Electronic Document Service 1-1987 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.