My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/19/1997 BOARD OF SELECTMEN Minutes
>
8/19/1997 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 3:51:20 PM
Creation date
1/30/2019 3:47:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
08/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and ties would be performed in order to cone <br /> commercial or residential interests, recreation, f <br /> historical and archeological sites, are expected to be year reviews. <br /> high. institutional controls will prohibit drilling of No property ro erty access would be required. <br /> E g -io <br /> new wells within,or in the direct path of,the CS there would be no construction, there woi <br /> g plume.lume. Residences over or directly risk to human health or the environment <br /> downgradient of the plume have been or are socioeconomic impacts, as a result of coi <br /> scheduled to be connected to public water supply,• and operation. <br /> There may not be adequate controls on existing f <br /> well5f <br /> y q Cost: Total capital cost is estimated 1 <br /> Annual monitoring cost is estimated to <br /> Effectiveness of Treatment Systems: The no- million. Life-cycle cost, including cad <br /> action alternative will not remove VOCs, EDB, based on 20 y P ears of operation (for cost-� <br /> semi-volatiles, or inorganics. Because this alter- u oses only);5 estimated to be$2 mllioi <br /> • will be no PrP <br /> native includes no active treatment, there lic acce tai <br /> does not satin Public Acceptance: The pub p <br /> treatment residuals. This alternativefy <br /> the response alternatives will be d <br /> a statutory preference for treatment as a. principal <br /> throughout the public comment period. I <br /> element. <br /> tine organizations, agencies, and commun. <br /> f <br /> Implementability: Because this alternative (acceptance groups)will review the inforn <br /> valves no action, there ,is no system startup time or indicate a referred choice, acceptable s( <br /> P <br /> anticipated period of operation. Monitoring acty � third choices, and any unacceptable all <br /> }E <br /> h _ _- <br /> . <br /> t <br /> i <br /> ii <br /> 'I <br /> } <br /> .i. <br /> .1 <br /> I <br /> i <br /> i <br /> i <br /> i <br /> 'i <br /> i <br /> i .www^Ir��r�rwrr•rw�rr.l�rrl+.�r-I r nrr..rr-.i�rnim..i�irl.in�rEr_nr.urr�l�nlr.n - I E.n.i.rror�r.r.rrrnrrrrrrr..+.�E -- <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.