My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/5/1996 BOARD OF SELECTMEN Minutes
>
2/5/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:01:34 PM
Creation date
1/31/2019 11:48:13 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
02/05/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a Board of Selectmen <br /> i.T <br /> Minutes <br /> F_ <br /> February 5 1996 <br /> 'ykt <br /> OLD B . <br /> Discussion relative, Town Hall WIter . <br /> Selectman Caffyn submitted cost estimates for the Town Hall water <br /> main project to the Board of Selectmen for review. <br /> The Town of Mashpee's share of the water maina ro'ect is estimated <br /> s. <br /> : P <br /> as follows: <br /> System Installation $73,1622.00 <br /> Street to Blg-Fees $ 29620.00 <br /> Contingency-Interest $ 3,600.00 <br /> total estimated cost $79,842.00 <br /> It was noted that theoriginal estimate of the Town Hall water main <br /> project was $130,000. <br /> Selectman Caffyn indicated that it is important to connect to Town water <br /> er <br /> to protect the financial investment of the new Town Hall renovation <br /> project. <br /> Selectman Caffyn suggested the Selectmen request the Capital Improvement <br /> eq p pro ement <br /> Committee to consider the water main as a capital <br /> improvement line item in <br /> their budget or perhaps develop an article for Town Meeting g <br /> ask n citizens <br /> . <br /> to support the prod ec t. <br /> It was noted that the system water main project could be paid for over <br /> several years. This would minimize the financial impact. <br /> Selectman Mills related concerns with respect to the commercial <br /> . sP <br /> connection and betterment fee's that appear substantially less than the <br /> Town's share of the project. <br /> Fire Chief Baker indicated that it is important torotect Town buildings. <br /> P <br /> He noted that he understands the financial budget constraints at this time. <br /> By regulation and by code,it is an option that is not required b statute <br /> stated Chief Baker. <br /> � Y <br /> It was noted that the Town Hall Building Committee has included the <br /> necessary plumbing for the fire suppression system into the firsthase <br /> f i P <br /> o the design of the building. <br /> Motion made by Selectman Mills to refer the matter of the <br /> Town Hall water main project to the Town Hall Building <br /> Committee for review and determination. <br /> Motion seconded by Selectman Dinizio. <br /> VQ <br /> Unanimous. 3-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.