My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/23/1996 BOARD OF SELECTMEN Minutes
>
5/23/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:10:18 PM
Creation date
1/31/2019 3:35:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
05/23/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> Change Order OWNER <br /> ij <br /> AIA Document G701 Electronic Format ARCHITECT [xj <br /> CONTRACTOR [x] <br /> FIELD jxJ <br /> OTHER [ ] <br /> k: <br /> l;i•J <br /> CHANGE ORDER ER: 01� <br /> PROJECT: ; <br /> name,address) <br /> I, <br /> Makee High School <br /> DATE: April ee 25 1995 <br /> Mash MA <br /> p � til <br /> - <br /> CONTRACTOR: <br /> HI <br /> T4 ;I;IIi <br /> ARCHITECT'S PROJECT NO: 94023 t' <br /> (name,address} <br /> tone Building Com an <br /> The S p CONTRACT DATE. May 8. 1995 <br /> 784 Allens Avenue <br /> Providence RI 02905 CONTRACT FOR: General Construction <br /> Pr <br /> Contract is changed as follows: <br /> The Con g <br /> 1.Add 2 catch basins and 485 l.f. of 12" storm PIDin north of the Soccer Field, per ChanQe Estimate 33 dated <br /> Ii <br /> 4119196. <br /> Not Valid until signed by the Owner, Architect and Contractor. <br /> f: <br /> • .00 I:=, <br /> ori final Contract Sum $15,090,000 <br /> The was -- <br /> a1 �CZ'Z�fL <br /> Net ed Change orders `77� %W..O <br /> Q+'-+ w <br /> change by previously authoriz g <br /> i <br /> The(Contract Sum r 4=0 <br /> j. <br /> prior to this Change order was $18 863-1726.00 <br /> Z11.1 <br /> The will be <br /> Contract Sum} <br /> 00, <br /> (increased Y <br /> b this Change order in the amount of $20,356.00 <br /> Ii. <br /> i <br /> I. <br /> THIS <br /> GC1i1/1ENTHAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> ENOURAGED WITH RESPECT TO ITS COMPLETION <br /> C OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D40I. � <br /> l <br /> AIA nOCtWENT 0701-CHANGE ORDER-1987 EDITION-AIA-COPYRIGHT 1987-THE AIMEMCAN INSTITUTE OF ARCHITECTS,i73S NEW YORK AVENUE.N.W., 'f <br /> w'�S�GTDN.D.C. 2OW6 39Z.W�1R,YING:Unlicensed phatowpyiag Dialates U.S.eap]'TiSht I�vrs uzd i=subject t�IeB�!grosrcution.This <br /> document wu elrctrvaiuily produced under <br /> I: <br /> "Cenfe number 796001239 and can be reproduced without vioIadaa Until 7/27!96- , <br /> Electronic Document Service G701-19$7 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.