My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/3/1996 BOARD OF SELECTMEN Minutes
>
6/3/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:11:06 PM
Creation date
1/31/2019 3:37:23 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
06/03/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> r e r OWNER x <br /> .Change � <br /> ASA Document G701 -- Electronk Formai ARCHITECT jx <br /> CONTRACTOR [x] <br /> FIELD [x] <br /> OTHER <br /> PROJECT: CHANGE ORDER NUMBER: 017 <br /> (name,address) <br /> �a�h ee High Scho�I <br /> h ee MA DATE: Ma 24 1996 <br /> i <br /> TO CONTRACTOR: ARCHITECT'S PROJECT NO: 94023 <br /> (name,address) CONTRACT DATE: May 8,1995 <br /> The Stone Building Company <br /> 780 Aliens Avenue CONTRACT FOR: General Construction <br /> Providence,RI 02945 <br /> The Contract is changed as follows: <br /> I,Chane Wood Shop Dust Collector from funnel bottom to flat bottomper Change Estimate 32 dated 5116196... <br /> 2.Relocate windows on grid 7 to all n with block coarsing, er Chan a Estimate 48 dated 315196. <br /> 3,Credit and Extended Warranty for revised installation of roofing vapor barrier,_per Change Estimate 49 dated./ <br /> 4124196. - <br /> 4.Remove tube steel header at location of curtain wall framing e E and E.2 er Change Estimate 62 dated 51 <br /> 2196. <br /> 5.Change lavatory type'A' to type 'B' in Staff toilets and shower e'A'to type'B' in Coache's Shower, per <br /> Chane Estimate 73 dated 511196. <br /> Not valid until signed by the owner, Architect and Contractor. <br /> The original(Contract Sum) <br /> Gunr2-mfeed ax was $18,9090,000-00 <br /> Net change bYpreviously authorized Change Orders _ $7942082-00. <br /> THIS DOCUMENTHA5 IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> ENCOURAGED WITH RESPECT TO ITS COMPLETION N OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D40I. <br /> AIA DOCUMENT G701-CHANGE ORDER-1987 EDITION-AIA-COPYRIGHT 1987-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW Yo RK AVENUE,N.W•, <br /> WASHINGTON,D.C.,20006-5292.WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to Iegal prosecution.This document was electronically produced under <br /> liven:t number 796001239 and can be reproduced without violation until 7I27I96. _ <br /> Electronic Document Service G701-1987 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.