My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/17/1996 BOARD OF SELECTMEN Minutes
>
6/17/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:11:45 PM
Creation date
1/31/2019 3:39:09 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
06/17/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order <br /> OWNER [x] <br /> AIA Document G701 - Electronic Format ARCHITECT [x] <br /> CONTRACTOR [x] <br /> FIELD [x] <br /> OTHER [ ] <br /> PROJECT: CHANGE ORDER NUMBER: 018 <br /> (name,address) <br /> DATE: June 10 1996 <br /> ggtee High School <br /> Mash e e MA - <br /> T <br /> CONTRACTOR: ARCHITECT'S PROJECT NO: 94023 <br /> (name,address) CONTRACT DATE: Ma 8, 1995 <br /> The Stone Building Company <br /> 784 Allens Avenue CONTRACT FOR: General Construction <br /> Providence, R1 02905 <br /> The Contract is changed as follows: <br /> 1,Remove and replace unsuitable existing subbase material with suitable fill at the perimeter road and bus <br /> I <br /> parking,per Change Estimate 26 dated 5130196. �! <br /> 2,Modify the elevator roof vent framin ,_per Change Estimate 3-1,-dated 5114196. <br /> 3,Provide fire ratio for doors A102 and B102 ., per Change Estimate 39 dated 5130196. ; <br /> 4.Add three way valve at FCU-2 er Change Estimate 84, dated 5130196. <br /> f ' <br /> f <br /> Not valid until signed b the owner, Architect and Contractor. <br /> 9 Y <br /> was $18.50909000.00 <br /> The original Contract Sump . <br /> $799,1 X3.00Net change by previously authorized Change orders <br /> f <br /> The(Contract Sump <br /> prior <br /> $18889 103.00 <br /> p to this Change Order was <br /> THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D40I. <br /> AIA DOCUMENT 6701-CHANGE ORDER-1987 EDITION-AIA-COPYRIGHT 1987-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE,N.W., <br /> WASHINGTON,D,C.,20086-5292.WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.This document was electronically produced under <br /> license number 796001239 and can he reproduced without violation until 7127/96. <br /> Electronic Document Service G 701-19 87 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.