My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/26/2017 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
10/26/2017 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:41:55 PM
Creation date
2/11/2019 11:13:00 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/26/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Planning and Construction Committee <br /> Minutes of Meeting Held Thursday, October 26, 2017 <br /> Mashpee Town Hall--Ockway Meeting Room. <br /> Committee Members Present: Steve Cook, Joe Brait, and Geoffrey Gorman <br /> Also Present: fatty DeBoer, Superintendent <br /> Catherine Laurent,DPW <br /> The meeting was called to order at 5:15 p.m.. <br /> Approval of Minutes <br /> Geoff Gorman motioned to accept the minutes of the September 7, 2017 meeting; Steve Cook <br /> seconded the motion. <br /> Vote: 3 Yes, 0 No Steve Cook,yes. Geoffrey Gorman,yes. <br /> Joe Brait,yes. <br /> Geoff Gorman motioned to accept the minutes of the September 22, 2017 meeting; Steve Cook <br /> seconded the motion. <br /> Vote: 2 Yes, 1 Abstain Steve Cook,yes. Geoffrey Gorman,yes. <br /> Joe Brait, abstain. <br /> Old Business <br /> Update on Quashnet School Windows/Roof Project <br /> Catherine reported that only two proposals were received in response to RFQ for the CMR--- <br /> Boston Building &Bridge Corp. and J.J. Cordosi, Inc.. State statute requires a minimum of three <br /> so the proposals were rejected. The normal procurement with filed sub-bids and a bid for a <br /> General Contractor will be followed. Selection will be based on the lowest, qualified bid. <br /> The RFB was issued yesterday, October 25. The proposed schedule is: <br /> October 30 Pre-bid meeting at 3 pm <br /> November 14 Filed sub-bids due at 2 pm <br /> November 28 General Contract bids due at 2 pra <br /> December 4 Contract award by Board of Selectmen <br /> By December 22 Window shop drawings submitted <br /> By January 2 Shop drawings reviewed by RDA <br /> April 23 Windows arrive <br /> The schedule is based on a 16 week lead time after ordering of the windows. If this time frame <br /> is accurate, the GC would mobilize at the school on April 9 to begin preparations. The phased <br /> plan prepared by RDA and MaryKate would be followed,though there may be some discussion <br /> with the GC on the scheduled once they are on board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.