My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/12/1996 BOARD OF SELECTMEN Minutes
>
8/12/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2019 4:29:33 PM
Creation date
2/21/2019 4:28:28 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
08/12/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
k <br /> t <br /> I <br /> f <br /> ..... Change Order <br /> OWNER [x� <br /> i <br /> AIA Document G701 - Electronic Format ARCHITECT � <br /> t � <br /> } <br /> `= CONTRACTOR [x] <br /> FIELD [x] <br /> ' OTHER <br /> PROJECT: CHANGE ORDER NUMBER: 021 <br /> (name, address) <br /> Mashpee High School <br /> Mash�eez MA DATE: August 5, 1996 <br /> { ARCHITECT'S PROJECT NO: 94023 <br /> TO CONTRACTOR. <br /> name, address) CONTRACT DATE <br /> May 84? 1995 <br /> { The Stone Building Cam an <br /> 780 Allens Avenue <br /> r CONTRACT FOR: General Construction <br /> Providence, RI 02905 <br /> The Contract is changed as follows: <br /> 1.Provide electric meter at Waste Water Treatment Plant per Change Estimate 68 dated 7/2/96. <br /> 2-Provide attic temperature sensors , per Change Estimate ?$, dated 7110196. <br /> 3.Provide one storm water catchbasin south of tennis courts, per Change Estimate 98, dated 712195. <br /> 4.Provide 400 amp disconnect switch at dirnm in&cabinet -per Chan a Estimate 99 dated 712196. <br /> 5-Revise power feed to lilaper Chan e Estimate 100 dated 712/96. <br /> 6.Pravide receptacle for EMS system in Room C 151 er Chan a Estimate 101 dated 712196. <br /> f 7.Provide power for chemical feed purn for the chiller,.per Chancre Estimate 102 dated 712196. <br /> 8.Pravide power for exhaust fans 42 and 43per Chan e Estimate 103 dated 7/2196. <br /> 9-Provide starters for <br /> pumps 3 and 4, per Chane Estimate 104,_dated 712196. <br /> -- ... .._._. <br /> 10.Provide wire mesh at exhaust fans 30 and 31 and provide RRI 1 re isters in lieu of RR4 re isterser Change <br /> 'n Estimate 105 dated 7110196. <br /> F;"" I I.Provide drywall soffit over beam in boom A23 5,-per Change Estimate 108,, dated 7/11/96. <br /> ;Y <br /> 12 No dify rough op ening for cabinet unit heaters in coridor A 13 0 and B 131per Chna a Estimate 109 dated 7/ <br /> 11196. <br /> Yom+ <br /> Yy� . <br /> Y:k Not valid until signed by the Owner Architect and Contractor. <br /> h <br /> r <br /> HIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D40 1. <br /> AIA DOCUMENT G701-CHANGE ORDER-1987 EDITION-AIA•COPYRIGHT 1987-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE,N.W., ; <br /> .k. <br /> WASHINGTON D.C.,20006-5292,WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.This document was electronically Produced under <br /> license member 797041239 and can be reproduced without violation until 7131197. <br /> Electronic Document Service G701-1987 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.