My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/04/2015 Special Town Meeting
>
05/04/2015 Special Town Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2019 2:20:48 PM
Creation date
3/27/2019 2:20:43 PM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the Town of Mashpee purchased a bathhouse/picnic pavilion, at a cost of $92,821.92, and <br /> presently maintains possession of this structure. <br /> The Town anticipated installing the purchased bathhouse/picnic pavilion at John's Pond Beach; <br /> however, upon review and further consideration of plumbing and septic requirements, soil <br /> conditions and irregular topography at the John's Pond site, the project was deemed to be cost <br /> prohibitive. The project budget, as initially estimated, did not anticipate or reflect the cost of <br /> water and septic improvements required for the bathhouse, a facility that would be used for <br /> approximately three months during the beach season. It was, thus, determined, in the interest of <br /> the Town, that the installation of this structure at the John's Pond Beach location was not a <br /> feasible option. <br /> Upon further review, the Community Preservation Committee voted to recommend installation <br /> of the bathhouse/picnic pavilion at the more widely used Heritage Park recreation facility. The <br /> multi-use recreational site consists of two playgrounds, a basketball court, the splash pad and <br /> eight athletic fields, which are actively used by the Town from March through November. There <br /> are presently no permanent restroom facilities at the Heritage park site location. The DPW has <br /> proposed to locate the bathhouse/picnic pavilion behind the lighted playing field referenced as <br /> Field 3. At this location, the facility would be readily accessible to two baseball fields and two <br /> multi-purpose fields. <br /> In consultation with the Community Preservation Coalition in Boston, the Community <br /> Preservation Committee determined that the transfer of the bathhouse structure, upon <br /> recommendation by the Committee, would be permissible pending final approval and authority <br /> by Town Meeting. <br /> The additional Community Preservation Fund appropriations requested by this article, in the <br /> amount of$63,000, would fund the design, permitting, septic and water connections, a concrete <br /> foundation/pad and parking lot lighting to improve and enhance the Heritage Park property for <br /> the community and its users. <br /> Approval of this article would, thus, authorize the bathhouse/picnic pavilion transfer and <br /> installation at Heritage Park, and fund the installation of lighting in the parking lot area for safety <br /> and security purposes. The Mashpee Dog Park will be situated across the street from Heritage <br /> Park, and users of that facility would also likely take advantage of the lighted parking lot. <br /> If the project is supported by the Town Meeting, the subject improvement would be completed <br /> by mid-summer 2015. Funding would be appropriated from the CPC 10% Open <br /> Space/Recreation Reserves for this purpose. <br /> The Community Preservation Committee voted 8-0 in support of this article. <br /> The Board of Selectmen recommends approval by a vote of 5-0. <br /> The Finance Committee recommends approval by a vote of 6-0, 1 absent. <br /> Motion made by Selectman Andrew Gottlieb. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.