My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/07/2012 Special Town Meeting
>
05/07/2012 Special Town Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2019 3:02:28 PM
Creation date
3/27/2019 2:56:00 PM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Motion passes unanimously at 7:24 PM. <br /> Article 12 <br /> To see if the Town will vote to appropriate and transfer from available funds $50,000 to the <br /> Santuit Pond Dam Account, to be expended under the direction of the Town Manager, for <br /> design, permitting, archeological evaluation, and reconstruction of the dam and fish ladder on <br /> Santuit Pond, or take any other action relating thereto. <br /> Submitted by the Board of Selectmen <br /> Explanation: The Town is under order from the Massachusetts Office of Dam Safety to <br /> reconstruct the earthen embankment dam on Santuit Pond. The dam is located on the southern <br /> edge of the pond within the Santuit Pond Preserve, a property of over 200 acres purchased jointly <br /> by the Towns of Mashpee and Barnstable in 2002. Integral to the dam is a fish ladder which <br /> provides passage for river herring and American eel to Santuit Pond. Because of this fish <br /> ladder, the Town was able to secure funding for the re-construction of the dam and fish ladder <br /> through the Cape Cod Water Resource Restoration Project (CCWRRP), a federally funded <br /> program with multiple goals including the improvement of fish passage. A requirement of the <br /> CCWRRP is a 25% local match. The estimated project cost, including design and construction, <br /> is almost $500,000. Approximately $400,000 of this cost will be paid through the CCWRRP. <br /> The $50,000 sought by this article is Mashpee's share of the local match plus funding for other <br /> required work that is not eligible for the CCWRRP, including permitting and an archeological <br /> site evaluation. The Town of Barnstable will also be responsible for contributing $50,000 to the <br /> project. Per the Dam Safety Order issued by the state and the funding agreement for the <br /> CCWRRP, reconstruction of the dam must be completed by October 31, 2012. <br /> The Board of Selectmen recommends approval by a vote of 5-0. <br /> Finance Committee recommends approval by a vote of 5-0, 2 absent. <br /> Motion made by Selectman Michael Richardson. <br /> Motion: I move the Town vote to appropriate and transfer from available funds $50,000 to the <br /> Santuit Pond Dam Account, to be expended under the direction of the Town Manager, for <br /> design, permitting, archeological evaluation, and reconstruction of the dam and fish ladder on <br /> Santuit Pond. <br /> Motion passes unanimously at 7:25 PM. <br /> Article 13 <br /> To see if the Town will vote to appropriate and transfer from available funds $60,000 to the <br /> Unemployment Trust, or take any other action relating thereto. <br /> Submitted by the Board of Selectmen <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.