Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> FEBRUARY 27,2019 <br /> 1. The Board has determined that the applicant meets all the conditions of a Variance <br /> under Mass General Law 40A Section 10. <br /> 2. Plot Plan: Prepared for: Gary D. & Claire L. Briggs, 51 Massasoit Ave, Mashpee, <br /> MA. Sheet No.: 1 of 1, Date: January 16, 2019, Drawn by: JVB, Checked by: MC, <br /> Prepared by: Cape & Islands Engineering, Drawing Title: Proposed Garage Plan, <br /> Assessors Information: 72 /45 / 0. 2/19/19: Revise Proposed Garage Location, by <br /> JVB and MC. <br /> 3. Garage Plan: David McLean, Architectural Design Services, Production Title: <br /> Garage, Drawing #1 Title: Elevations, Designer: DAM, Scale: 1/4" = 1', Date: <br /> 2/8/2019, Front Elevation, Right Elevation, Rear Elevation, Left Elevation, <br /> Drawing #2: Garage, Floor Plans & Foundation, and Designer: DAM, Drawn by: <br /> DAM, Scale: 1/4"= 1', Date: 2/8/19. <br /> 4. The Board issues a Variance; the required side yard Variance is 15 ft., and the <br /> applicant has 12 ft.,the relief will be in the amount of 3 ft. <br /> 5. There is no habitable space allowed in this garage. <br /> 6. Conditioned on all Town Department comments read into the record. <br /> Mr. Gould seconded. <br /> Mr. Blaisdell, yes, <br /> Ms. Sangeleer, yes, <br /> Mr. Furbush, yes. <br /> All were in favor to issue a Variance for a detached garage. <br /> 29 Overlook Knoll Road: Owners, Frederick J. and Linda Naddaff request a Special <br /> Permit under §174-17.1 of the Zoning Bylaws to raze and replace a non-conforming single <br /> family structure on property located in an R-3 Zoning District, and the Popponesset <br /> Overlay District,Map 118 Parcel 33, Mashpee, MA. <br /> Attorney Kevin Kirrane represented the homeowners for their raze and replace of a single- <br /> family structure that bounds Seaview Ave and Overlook Knoll Road, and Nantucket <br /> Sound. <br /> Mr. Kirrane said that the process started over a year ago as a result of the issues concerning <br /> the revision of the Zoning Bylaw relative to raze and replace projects. It was deferred until <br /> the time the bylaw was changed and approved by the Attorney General's office. Once that <br /> occurred,he resubmitted the plan for the Board's consideration. <br /> 4 <br />