My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2019 ZONING BOARD OF APPEALS ZBA Decision
>
02/13/2019 ZONING BOARD OF APPEALS ZBA Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 5:01:34 PM
Creation date
3/29/2019 2:20:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
ZBA Decision
Meeting Date
02/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A VARIANCE <br /> Blue Sky Towers II,LLC <br /> 101 Red Brook Road (Map 104 Parcel 2) <br /> Mashpee, MA 02649 <br /> V-2019-10 <br /> ® We also have letters from our local residents which show the medical need for this <br /> tower and,therefore,it has been clearly demonstrated that advancements in medical <br /> technology need a cell tower to deliver an internet connection,in which it provides <br /> the lifesaving monitoring that only a cell tower can provide.It should also be noted <br /> that radio waves cannot be the basis for a denial for a variance. <br /> ® It has been established that there is a substantial gap in the coverage in the southern <br /> part of the Town of Mashpee. <br /> • That the location of the proposed tower will significantly close this gap. <br /> • That the proposed height is not excessive but is high enough to address the <br /> topographical impediments to provide the necessary coverage. <br /> • That the letters from our first responders and local residents have demonstrated that <br /> there is a need for this tower to provide for the safety for our citizens. <br /> ® It has been stated that medical technology has evolved to use the internet to <br /> monitor their patients and this cannot happen without a cell tower. <br /> The ruling is also based on the following conditions: <br /> 1. Plans: Blue Sky Towers II, LLC, Site Name: Mashpee Fire Station #2, Site Number: <br /> MA-5112,Address: 101 Red Brook Road,Mashpee,MA 02649.Prepared by:ProTerra <br /> Design Group, LLC, 4 Bay Road, Building A: Suite 200, Hadley, MA 01035. Title <br /> Sheet: T-1,Date: 09/27/17,Drawn:BLM/STZ, Check: JMM/TEJ, Scale: See Plan, Job <br /> No.: 17-063, Abutters Plan: C-1, Existing Conditions: C-2, Aerial & USGS Maps, A- <br /> 1, Compiled Plot Plan: A-2, Overall Site Plan: A-3, Compound Plan&Elevation: A-4, <br /> Siting Elevations: SE-1, Siting Elevation: SE-2, Details: D-1, Tenant Details: CA-1, <br /> Tenant Details: CA-2, Tenant Details: CA-3, Tenant Details: CA-4, Erosion Control <br /> Plan&Details: EC-1. <br /> 2. The electrical power from the street is to be underground. <br /> 3. All Town Department comments previously read into the record. <br /> 4. The Variance relief required is 116 ft. to build a 150 ft. cell tower. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.