Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A VARIANCE <br /> Blue Sky Towers II,LLC <br /> 101 Red Brook Road (Map 104 Parcel 2) <br /> Mashpee, MA 02649 <br /> V-2019-10 <br /> ® We also have letters from our local residents which show the medical need for this <br /> tower and,therefore,it has been clearly demonstrated that advancements in medical <br /> technology need a cell tower to deliver an internet connection,in which it provides <br /> the lifesaving monitoring that only a cell tower can provide.It should also be noted <br /> that radio waves cannot be the basis for a denial for a variance. <br /> ® It has been established that there is a substantial gap in the coverage in the southern <br /> part of the Town of Mashpee. <br /> • That the location of the proposed tower will significantly close this gap. <br /> • That the proposed height is not excessive but is high enough to address the <br /> topographical impediments to provide the necessary coverage. <br /> • That the letters from our first responders and local residents have demonstrated that <br /> there is a need for this tower to provide for the safety for our citizens. <br /> ® It has been stated that medical technology has evolved to use the internet to <br /> monitor their patients and this cannot happen without a cell tower. <br /> The ruling is also based on the following conditions: <br /> 1. Plans: Blue Sky Towers II, LLC, Site Name: Mashpee Fire Station #2, Site Number: <br /> MA-5112,Address: 101 Red Brook Road,Mashpee,MA 02649.Prepared by:ProTerra <br /> Design Group, LLC, 4 Bay Road, Building A: Suite 200, Hadley, MA 01035. Title <br /> Sheet: T-1,Date: 09/27/17,Drawn:BLM/STZ, Check: JMM/TEJ, Scale: See Plan, Job <br /> No.: 17-063, Abutters Plan: C-1, Existing Conditions: C-2, Aerial & USGS Maps, A- <br /> 1, Compiled Plot Plan: A-2, Overall Site Plan: A-3, Compound Plan&Elevation: A-4, <br /> Siting Elevations: SE-1, Siting Elevation: SE-2, Details: D-1, Tenant Details: CA-1, <br /> Tenant Details: CA-2, Tenant Details: CA-3, Tenant Details: CA-4, Erosion Control <br /> Plan&Details: EC-1. <br /> 2. The electrical power from the street is to be underground. <br /> 3. All Town Department comments previously read into the record. <br /> 4. The Variance relief required is 116 ft. to build a 150 ft. cell tower. <br /> 7 <br />