My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/11/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
02/11/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 5:03:28 PM
Creation date
4/2/2019 1:27:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
02/11/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total area size is 11 acre equal to appro4mately 60.005 square feet <br /> There is ho significant shellfish population in this area due to the WU being muck <br /> apprmdmalely 1.5 to 15 feat deep or deeppr. There is no eel grass in this area. <br /> Refer to Figure 3(Shellfish Resourcess Areas) <br /> Buoy$Will be yellow'approximately 16 Inches in dimeter with proper Identification at all <br /> four comers of tE o grant Two inch lettering will be used that displays this as a shellfish <br /> aquaoubm grant and our grant#will also be iaduded once provided. This grant is not <br /> in any navigable channel or in the mmoring fields. Figure 4(Boating Facilities) <br /> Shotures used will be cages, bags,anchors, rope and chain, Cages will consist of <br /> vinyl boated wire mesh 4 X 4 ft and 3 X 5 ft, Bags will be nylon or plastic mesh <br /> approximaief y 2 X 3 ft Bndom cages not more than 12 inches off the bottom wit the <br /> option of some floating cages as allowed by the Army Corps of Engineers. We will <br /> utilise bird deterrent devices on the floating gear. R.Or to Figure 5 <br /> No fill will be usW in the area of the grant Please be Alsed that to area of the grant <br /> is not privately owned, <br /> The floating gear bags will be placed to the landward side of the grant(easterly)ami <br /> cagesWill be placed on tt o bottom of the seaward side (weslet of the grant Work <br /> on ti�is grant will be conducted from a sIM. <br /> landing of the product will occur at Ockway or Mashpee Deck Landing with town <br /> perml-for launching. <br />
The URL can be used to link to this page
Your browser does not support the video tag.