Laserfiche WebLink
S PEE.ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> MARCH 27,2019 <br /> Mr. Bonvie made a motion to issue a Variance in the amount of 41.5 feet to Kevin H. and <br /> Maryellen M. Kelley under §174-33 of the Zoning Bylaws to allow for construction of a <br /> deck situated within the wetlands resource area on property located in an R-3 Zoning <br /> District and Little Neck Bay cluster subdivision, Map 120 Parcel 182,Mashpee, MA. <br /> 1. The Board has determined that the applicant meets all the conditions of a Variance <br /> under Mass General Law 40A Section 100 <br /> 2. Site Plan: Kevin Kelley, 123 Tide Run, Mashpee, MA. Scale: 1"=20', Date: April <br /> 11, 2018, Provided by: Warwick & Associates, Inc., 63 County Rd, N. Falmouth, <br /> MA. Drawn by: L.M., R.J.W., Date: 04/11/2018, Checked by: GSL, Sheet 1 of 1, <br /> Plan Revisions: 2/28/19,Add Expanded Deck,Revise Lot Coverage. <br /> 3. New Deck Addition For: Kelley Residence, 123 Tide Run, Mashpee,MA. Scale: <br /> 1/4' = 1'-0", Date: 2/27/2019, Drawn by: Cotuit Bay Design, LLC, Drawing No. <br /> Al: First Floor Plan,A2: New Deck Addition, Framing/Footing Plan, <br /> 4. Conditioned on all Town Department comments read into the record. <br /> 5, Conditioned that the applicant obtaining Conservation Commission approval prior <br /> to filing of building permit. Any Variance or changes to the plan will require the <br /> applicant to return to the Zoning Board for approval. <br /> Sharon seconded,yes, <br /> Mr. Blaisdell,yes, <br /> Mr. Furbush,yes, <br /> Mr. Bonvie, yes. <br /> All were in favor of the deck project. <br /> 17 Cedar Street: Owners, George L. and Kathleen J. Hodgson request a Variance under <br /> §174-33 of the Zoning Bylaws to allow for construction of an elevated stairway to a dock <br /> situated within the wetlands resource area on property located in an R-3 Zoning District, <br /> Map 77 Parcel 37,Mashpee, MA. <br /> Mr.Wayne Tavares,Landscape Architect with Wet Tech Land Design,Inc,He represented <br /> the Hodgson's for their dock and stairway project. He has already received approval with <br /> Conservation, and went through the State permitting process. After speaking with the <br /> Building Inspector, it was discovered that the project requires a filing within the 50 ft. <br /> buffer. The stair structure is needed to reach the dock. The lot coverage is 14.7%with the <br /> stairs,and 14.1%prior to the stairs.The setbacks on the side line 37 ft. and does not intrude <br /> on the side setback. It's a structure that is needed, and will require the removal of three <br /> trees on the coastal bank. The footings on the stairs have been discussed with the Building <br /> Department..There's approximately 43 steps to the deck, and it's a 91 foot stairway that <br /> has 10 landings, and meets the code of with no more than 12 steps. The risers are very <br /> generous with the treads. The drop is 35 ft. to the top of the rock wall. <br /> 4 <br />