Laserfiche WebLink
*A. <br /> January during which they discussed the lack of an`gas built"print for the spillway. They would <br /> also like to get the town to clean out the weir. <br /> Popponesset Bay—Gerald Daly <br /> In Jerry's absence, Tim Leedham reported nothing new,no lee, and no damage. <br /> auoit Bay Area—Jing Hanks <br /> Jim Hanks reported the same is true of Wauoit with an occasional shell-fisherman to be seen. <br /> County Dredge Advisory Meeting—William Taylor <br /> Bill reported that there was no meeting. <br /> WaterwaysBy-laws and Regulations—Jim Hanks <br /> Jim reported that the revised Chapter 170, per Joyce Masson, should go into the Fall Town <br /> Warrant. We probably need to hold a public hearing and he will that check with Joyce Mason. <br /> Water Quality Update—Jim Hanks <br /> Jim prepared and forwarded a revised draft work statement for SMAST"'s 2006 water sample <br /> analysis to the Town Manager. SMAST has sent out a checklist of equipment for each sampling <br /> group to get a list of the equipment needing calibration or repair. <br /> . Sewer Cgmmission Citizens Advisory Committee—Paul Lumsden <br /> No meeting <br /> . Barnstable County Coastal Resources Cnm tt _ ndate—Gerald Daly <br /> Not present. <br /> . Watennays Improvement Plan and_DEgkinp,Permits_-Jim Hanks <br /> Mashpee River Dredge Project—Jing Hanks reported that Groundwater Analytical in Bourne can <br /> do the approved test method for determining soil conductivity for$12.50 per sample. When we <br /> get better weather and a boat available, we should sample at the locations Woods Hole Group <br /> sampled composite the samples, and get some tests clone. <br /> Maintenance Dredging - Save Popponesset Bay dredged 1400 cubic yards from the channel <br /> around the tip of Popponesset Island before their permits expired in January. <br /> The County Dredge is now dredging the outer channel of Popponesset Bay, and Will also dredge <br /> the inside charnel. Outside should produce about 4800 cubic yards, and inside about 1300 yards, <br /> That material will be placed near the stairway at the enol of Wading Place Road to repair the <br /> eroded coastal bank and get the material where it will travel along the entire spit, <br /> Next year we plan to use the booster to achieve the same goal. <br /> Jinn reported he Falmouth has issued a Request for Proposal for acquiring dredging pem-tits for <br /> the envy and main channels of Waquoit Bay. <br /> Page 2 of <br />