My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/6/2001 WATERWAYS COMMISSION Minutes
>
3/6/2001 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 5:03:59 PM
Creation date
4/23/2019 3:09:30 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/06/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
vaquoit Bay Area—Jim Hanks—Jim reported wa quoit Bay had some extremely low tides, <br /> and lots of ice. Pilings on a couple of docks near the Great lever boat ramp have lifted. <br /> County Dredge Advisory Meeting—William 'Taylor—No meeting. <br /> Waterways Bylaws and Regulations —Jim Hanks—No Activity <br /> Water Quality Update—Jinn Hanks <br /> Jing Hanks reported that he had prepared a briefing for the pilot Project explaining the method for <br /> allocating responsibility for nutrient pollution to the towns of Barnstable, Irashpee, and <br /> Sandwich. He said it was torn mart by the group, as he expected, and weld be better as a result <br /> Jim submitted the Town Meeting article for the upcoming May Special Town Meeting that he <br /> and Rick prepared. The article requests funds to sample sites in Popponesset Bay and wa uoit <br /> Bay gree dunes each. <br /> 4. Sewer Commission ion Citizens Adviso .Committee CAS Paul Lumsden— <br /> Jim reported that he has been reviewing the second report in 1 lashpee's watershed Nitrogen <br /> Management Plan,the dot Technology Screening Deport, and would provide a few comments t <br /> Torn Fudala. The next meeting of the Sewer Commission and CAC is scheduled for 7:00 PM 2 <br /> March. <br /> . Barnstable CgM!y Coastal Resources Committee Update—Gerald Daly-No meeting <br /> . w to s IMprovement Plan and Dredging Permits—Jim Hanks <br /> Mas pee liver Dredge Project— The second run, marsh front,under contract for modeling the <br /> three disposal scenarios—Islands,marsh front,and side casting has been completed. Jinn <br /> reported that he had received the data and has not yet met with the consultants for an explanation <br /> of the results. He showed the graph that indicates the scenario created slight improvement in the <br /> area.above Orsi <br />
The URL can be used to link to this page
Your browser does not support the video tag.