Laserfiche WebLink
Rick also.questioned the.statement hey heard-that.there-were no currents there,,but Jing <br /> stated that what they are doing is analyzing the currents in the area so they can predict <br /> where the material will.spread and how far it will move. Also, any material.dumped there <br /> must be compatible in terns of sediment characteristics,including contamination. <br /> Jinn Hanks Mated that he had.to stop.working on this aspect of the project.to-build..a.file of <br /> contract performance information for Joyce Mason to use in her contract negotiations,with <br /> Woods Hole Group. <br /> He then described a product called Penna-LOC plastic sheet pile. The idea mould be to use <br /> this product to build a large circular pond(say 20 acnes or more) out in the bay somewhere. <br /> It would look like a large-aboveground swimming pool- We could then go through cycles o <br /> "fill it with slurry, let it settle, then drain it"until we got the material up above the mean <br /> high water level. The Idea would be-to get the material high enough so that you could <br /> vegetate it,and let it compact over time until the material is at or near enough the high water <br /> level to become marsh. As.for the plastic, it can-either be driven in deeper as,the.settling <br /> tabes place,or cut off with a Sail as needed. <br /> Jim stated it would take a lot of structural analysis to.design a pool strong enough,.and that <br /> Crane Industries has offered him design.so ware for such purposes. <br /> Jirn also talked about an alternative.to.the sheet-piling would be to use Geote tile,tubes. <br /> He hien reviewed the project schedule since the beginning of the contract and highlighted <br /> differences-between the predicted timetable versus-the.actual timetable,. There-was a <br /> lengthy discussion of the shortfalls in the contractor's}performance. <br /> .ick asked about a nunor about somebody wanting to dredge a channel.20 feet 4eep <br /> through Shoestring Bay all the way up to the Condos. leo one knows where that came <br /> from. <br /> . Pro osed new.channel vice ara lel to <br /> Jim.Hanks tabled the item-since-the Mashpee River pro*ect is f a higher priority. <br /> NEW BUSINESS <br /> 1. Correspondence <br /> Incoming <br /> DEM <br /> October 2002, release.of ACEC Boundary Clarifications-for review, (Questions or <br /> comments due 8 Nov 02 <br /> E-Mail <br /> a� <br /> Page 4 of <br />