My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/4/2003 WATERWAYS COMMISSION Minutes
>
3/4/2003 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 5:03:45 PM
Creation date
4/23/2019 3:16:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/04/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and a representative from the Selectmen's office to discuss the legalities of using conservation <br /> Ll- land for disposal of dredged materials. <br /> Jing reported that little progress had been made on the Marsh Island approach, but that he <br /> had received a calculation from Joy Bennett that modeled the stilling basin concept using <br /> PermLoc plastic sheet piling. Jinn also described three spreadsheets he had developed. One, <br /> which he passed on to Joy Bennett, allows you to input the follovAng dredging parameters: <br /> Enter Flow late: <br /> Enter In Situ volume: <br /> Enter Heap Factor: <br /> Enter Silt to Water Ratio: <br /> Enter Hours per day: <br /> Enter Days per week: <br /> The program provides output such as several types of total volumes per unit time, or <br /> volumes of silt per unit time, and daily output of material. <br /> Another spreadsheet in the works is based on the WHG spreadsheet that calculates the <br /> number of days to fill a given volume. <br /> gird spreadsheet allows input of the dimensions of a circular or elliptical pit and calculates <br /> the time to fill, and the elevation of silt in the pit. <br /> Jiro stated that he has been in contact with John Brawley from some firm in Cambridge and <br /> that he is discussing island building. <br /> . Proposed new channel vice pgWlel to spit. <br /> Jiro Hanks tabled the item once again since the 1lashpee River project is of a higher priority <br /> and no work has been done. <br /> . Pop onesset Spit Nourishment <br /> Save Popponesset Bay Dredging <br /> Jinn reported that Save popponesset Bay had received their emergency dredging permit, and <br /> Corps permit to dredge around the tip of Popponesset Creek. Gilmore Marine completed <br /> that job. <br /> NEW BUSINESS <br /> 1. Correspondence (partial) <br /> Incoming <br /> From: <br /> March 03,John Brawley,RE: Salt Marsh or Other Islands Creation <br /> March, Greg Penta,USAG E,Ike: Extension of Dredging window for I opponesset Bay Outer <br /> Channel <br /> (more) <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.